| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Apr 6, 2026 | 39183387L | RESOLVE | CLASS - 1 | CLASS 1 CEASE USE: DOOR ZONE RESTRICTOR DEVICE FOUND INOPERATIVE. ELEVATOR CAR DOORS CAN BE OPENED WHEN THE CAR IS NO... | $1,250 | $1,250 | Jun 10, 2026 |
| Nov 1, 2024 | 39129199R | RESOLVE | CLASS - 1 | UNSAFE STORAGE OF COMBUSTIBLE MATERIAL AND EQUIPMENT. OBSERVED UNSAFE STORAGE UNDERNEATH STAIRCASE (BOXES AND FLOORIN... | $2,500 | $0 | Jan 15, 2025 |
| Oct 3, 2024 | 39126532H | RESOLVE | CLASS - 1 | I OBSERVED THE EMERGENCY DISCONNECT FOR THE GENERATOR INSTALLED IN THE MAIN ELECTRICAL ROOM AS PER BC 2702.1.7 , THIS... | $625 | $0 | May 23, 2025 |
| Oct 3, 2024 | 39126506Y | RESOLVE | CLASS - 2 | OBSERVED AT EXPOSURE 1 FDNY CONNECTION MISSING PROTECTIVE CAP ALSO SPRINKLER DRAIN DOWN RISER THROUGHOUT BUILDING NOT... | $0 | $0 | Dec 11, 2024 |
| Sep 24, 2024 | 39125688J | RESOLVE | CLASS - 1 | CEASE USE ITEM: BRAKE MONITOR MICRO SWITCH MISSING ACTUATOR. REMEDY: RESTORE TO SERVICE AND CALL THE DOB ELEVATOR DIV... | $3,125 | $3,125 | Jan 7, 2027 |
| Apr 7, 2022 | 35647157N | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT.NOTED:AT TIME OF INSPECTION OF ACTIVE JOBSITE OBSER... | $2,500 | $2,500 | Nov 17, 2022 |
| Feb 28, 2022 | 35643004Y | RESOLVE | CLASS - 2 | WORK DOESNT CONFORM TO APPROVED CONST DOCS &/OR AMENDMENTS.NOTED:ATO MY INSP OF N9STYB,CONST IN PROGRESS,BLDG TOPPED ... | $0 | $0 | Jul 20, 2022 |
| Nov 18, 2021 | 35633429K | RESOLVE | CLASS - 2 | FAILURE TO MAINTAIN/DISPALY ON-SITE DOCUMENTS REQUIRED BY CHAPTER 33-ACHOR LOG.NOTED:AT TIME OF INSPECTION OF NEW 9 S... | $0 | $0 | Mar 30, 2022 |
| Nov 18, 2021 | 35633428Z | RESOLVE | CLASS - 2 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDMENTS.NOTED:AT TIME OF INSPECTION OF NEW 9 STORY... | $0 | $0 | Mar 30, 2022 |
| Nov 18, 2021 | 35633427R | RESOLVE | CLASS - 2 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDEMENTS.NOTED:AT TIME OF INSPECTION OF NEW 9 STOR... | $0 | $0 | Mar 30, 2022 |
| Nov 18, 2021 | 35633431J | RESOLVE | CLASS - 1 | PERMIT HOLDER FAILED TO ENSURE WORKERS RECEIVE SITE SAFETY ORIENTATION OR REFRESHER.NOTED:AT TIME OF INSPECTION OF NE... | $5,000 | $0 | Mar 30, 2022 |
| Nov 18, 2021 | 35633430H | RESOLVE | CLASS - 2 | PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. NOTED:AT TIME OF INSPECTION OF NEW 9 STORY BUILDING CONSTRUC... | $2,400 | $0 | Mar 30, 2022 |
| Sep 15, 2021 | 35583224Y | RESOLVE | CLASS - 2 | CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES AS PER CODE.AT TIME OF INSPECTION ON 55 SHEFFIELD AVENUE A FSWO ... | $0 | $0 | Jan 30, 2023 |
| Sep 15, 2021 | 35583223M | RESOLVE | CLASS - 1 | UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORKER ORDER.AT TIME OF INSPECTION OF A 9 STORY NEW BUILDING,OBSE... | $12,500 | $12,500 | Jun 24, 2022 |
| Jan 8, 2021 | 35543102J | RESOLVE | CLASS - 1 | SEC. 3308.6 FAILURE TO PROVIDE HORIZONTAL SAFETY NETTING OR ALTERED PIPE SCAFFOLD. NOTE: AT TIME OF MY INSPECTION OF ... | $2,500 | $2,500 | May 19, 2021 |
| Jan 8, 2021 | 35543103L | RESOLVE | CLASS - 1 | GUARDRAILS. NOTE: AT TIME OF MY INSPECTION OF A 9 STY NEW BLDG AT ROOFLEVEL UNDER CONSTRUCTION. I OBSERVED INADEQUATE... | $2,500 | $2,500 | May 19, 2021 |
| Jan 8, 2021 | 35543104N | RESOLVE | CLASS - 1 | SEC. 3303.12 FAILURE TO PROVIDED HOIST/ELEVATOR. NOTE: AT TIME OF MY INSPECTION OF A 9 STY NEW BLDG AT ROOF LEVEL UND... | $2,500 | $2,500 | May 19, 2021 |
| Nov 18, 2020 | 35538496P | RESOLVE | CLASS - 2 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DRAWING.AS NOTED:AT TIME OF INSPECTION FOR AN ACTIVE CONSTRUCTION SITE... | $620 | $0 | Mar 31, 2021 |
| Nov 18, 2020 | 35538455Z | RESOLVE | CLASS - 1 | BC3305.3.6.1.2-FAILURE TO SECURE RESHORES AS NOTED AT THE TIME OF MY INSPECTION AT AN ACTIVE CONSTRUCTION SITE OBSERV... | $2,500 | $2,500 | Mar 31, 2021 |
| Nov 18, 2020 | 35538498Z | RESOLVE | CLASS - 2 | FAILURE TO PROVIDE ADEQUATE CARING BOX.AS NOTED:AT TIME OF INSPECTION FOR AN ACTIVE CONSTRUCTION SITE AT 8TH FL LEVEL... | $2,500 | $2,500 | Mar 31, 2021 |
| Nov 18, 2020 | 35538494L | RESOLVE | CLASS - 1 | BC1905.12 FAILURE TO IMPLEMENT COLD WEATHER REQUIREMENTS FOR CONCRETE PLACED DURING FREEZING OR NEAR FREEZING WEATHER... | $2,500 | $2,500 | Mar 31, 2021 |
| Nov 18, 2020 | 35538457M | RESOLVE | CLASS - 1 | BC3301.2-FAILURE TO MAINTAIN ADEQUATE SFATEY STRAP LOG BOOK NOTED AT THE TIME OF MY INSPECTION OF AN ACTIVE CONSTRUCT... | $2,500 | $2,500 | Mar 31, 2021 |
| Nov 18, 2020 | 35538495N | RESOLVE | CLASS - 2 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DRAWING.AS NOTED:AT TIME OF INSPECTION FOR AN ACTIVE CONSTRUCTION SITE... | $620 | $0 | Mar 31, 2021 |
| Oct 23, 2020 | 35537824K | RESOLVE | CLASS - 2 | BC 3301.7 FAILURE TO PROVIDE P.E APPROVED DESIGN DRAWINGS FOR REPAIRS.AS NOTED AT TIME OF INSPECTION OBSERVED REPAIRS... | $620 | $0 | Mar 3, 2021 |
| Oct 23, 2020 | 35537822R | RESOLVE | CLASS - 1 | BC 1906.6.1.2 FAILURE TO SECURE RESHORES IN PROXIMITY TO THE LEADING EDGE:AS NOTED AT TIME OF MY INSPECTION ON AN ACT... | $2,500 | $2,500 | Apr 9, 2021 |
| Sep 29, 2020 | 35511189P | RESOLVE | CLASS - 2 | FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33. NOTED: AT TIME OF INSPECTION OF AN ACTIVE JO... | $0 | $0 | Feb 10, 2021 |
| Sep 29, 2020 | 35511190M | RESOLVE | CLASS - 2 | SEC. BC 3307.2.3 TEMPORARY PUBLIC WALKWAY WITHIN THE SITE. NOTED: AT TIME OF INSPECTION OF AN ACTIVE JOBSITE. OBSERVE... | $625 | $625 | Feb 10, 2021 |
| Jul 1, 2020 | 35487298R | RESOLVE | CLASS - 2 | FAILURE TO PROVIDE CONSTRUCTION DOCUMENTS ON SITE. AT TIME OF MY INSPECTION OF A 9 STORY BUILDING AT FOUNDATION LEVEL... | $0 | $0 | Nov 4, 2020 |
| Jul 1, 2020 | 35487297P | RESOLVE | CLASS - 2 | 3309.9 FAILURE TO PROVIDE WEATHERPROOF INTEGRITY OF ADJOINING BUILDINGS. AT TIME OF MY INSPECTION,I OBSERVED THAT THE... | $0 | $0 | Nov 4, 2020 |
| Jun 30, 2020 | 35487910Y | RESOLVE | CLASS - 1 | WORK DOES NOT CONFORM WITH SIET SAFETY PLAN (SSP) UPON INSPECTION OF A 9 STROY NEW BUIDLING IN FOUNDATION PHASE I OBS... | $6,250 | $6,250 | Nov 4, 2020 |
| Jun 30, 2020 | 35487911X | RESOLVE | CLASS - 1 | 3307.2.1-OBSTRUCTION OF SIDEWALK UPON INSPECTION OF A 9 STORY NEW BUILDING IN FOUNDATION PHASE I OBSERVED EXPO #1 SID... | $6,250 | $6,250 | Nov 4, 2020 |
| Mar 23, 2020 | 35480418K | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33. NOTED:AT TIME OF INSPECTION OF AN ACTIVE JOB... | $625 | $625 | Jul 29, 2020 |
| Mar 23, 2020 | 35480416R | RESOLVE | CLASS - 2 | BC 3307.2.1 FAILURE TO COMPLY W/ DOT REGULATIONS. NOTED:AT TIME OF INSPECTION OF AN ACTIVE JOBSITE OBSERVED TRUCK BLO... | $620 | $0 | Jul 29, 2020 |
| Mar 23, 2020 | 35480417Z | RESOLVE | CLASS - 1 | BC 3301.13.12 COMPETENT PERSON. NOTED:AT TIME OF INSPECTION OF AN ACTIVE JOBSITE UPON REVIEWING CONSTRUCTION LOGS OBS... | $2,500 | $0 | Jul 29, 2020 |
| Feb 26, 2020 | 35472255P | RESOLVE | CLASS - 1 | SEC. 3301.2 FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES & TEMPORARY CONSTRUCTION. NOTE: AT THE TIME OF ... | $2,500 | $2,500 | Jul 1, 2020 |