169 Williams Avenue, Brooklyn
Brooklyn • Block 03717 • Lot 0006 • Zip: 11207
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Downtown Brooklyn 45 min 13 walking, 32 riding
- Fulton Street 52 min 13 walking, 39 riding
- Union Square 58 min 13 walking, 45 riding
- Grand Central 62 min 13 walking, 49 riding
- Penn Station 62 min 13 walking, 49 riding
- Times Square 63 min 13 walking, 50 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Happy
Happy Cafe is a cozy spot in Brooklyn offering delicious coffee, pastries, and sandwiches. Enjoy the warm and invitin...
Sweets & Things
No description yet
Room 1 Hundred
Polished venue with a mahogany bar & a patio serving mofongo, seafood & other Dominican fare.
Little Trelawny Grille
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
New Building
-
Alteration Type III
PROPOSED BPP FILING ON 25'-0" WIDE LOT ON WILLIAM AVENUE WITH (1) CURB CUT 13'-0" WIDE WITH (2) 2'-6" SPLAYS ON EACH ...
2024
2023
2022
-
DOB violation Feb 14, 2022
C-CONSTRUCTION OTHER OPTIONAL
BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER .APPLICATION #321314975 ON 2/10/22 DUE TO CONTRACTOR WITHDRAWAL
-
DOB violation Feb 14, 2022
C-CONSTRUCTION OTHER OPTIONAL
BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER .APPLICATION #321314975 ON 2/10/22 DUE TO CONSTRUCTION SUPERI...
-
DOB violation Feb 14, 2022
C-CONSTRUCTION OTHER OPTIONAL
BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER .APPLICATION #321314975 ON 2/10/22 DUE TO CONSTRUCTION SUPERI...
-
DOB violation Feb 14, 2022
C-CONSTRUCTION OTHER OPTIONAL
BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER .APPLICATION #321314975 ON 2/10/22 DUE TO CONTRACTOR WITHDRAWAL
2020
-
DOB violation Nov 25, 2020
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Nov 25, 2020
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
CLASS - 2
AT TIME OF INSPECTION,OBSERVED ONGOING CONSTRUCTION ACTIVITIES CONTRARY TO MAYORS EMERGENCY EXECUTIVE ORDER 120 & SUB...
-
CLASS - 1
SEC. 3303.2.2 FIRE HYDRANT BEING USED W/O AUTHORIZATION. AT TIME OF INSPECTION AT AN ACTIVE NEW BLDG CONSTRUCTION SIT...
-
CLASS - 1
SEC. BC 3303.2.2 FIRE HYDRANT BEING USED W/O AUTHORIZATION. AT TIME OFINSPECTION AT AN ACTIVE NEW BLDG CONSTRUCTION S...
-
CLASS - 1
PERMIT HOLDER/WORKERS EMPLOYER FAILED TO ENSURE THAT EACH CONSTRUCTIONOR DEMOLITION WORKER WORKING/ENGAGED AT THE SIT...
-
CLASS - 1
3301.2 FAILURE TO PROVIDE OVERHEAD PROTECTION @THE TIME OF INSPECTION 2 STY NB @ROOF LVL (APPROX 35 FT HIGH) SITE CIR...
-
CLASS - 2
TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED FENCE PERMIT. AT TIMEOF INSPECTION AT A JOBSITE NB 2 STY MAUFACTURIN...
2019
-
Alteration Type II
PROPOSED INSTALLATION OF NEW FIRE SERVICE AND SPRINKLER SYSTEM THROUGH-OUT IN CONJUNCTION WITH NB# 321314975 AS PER P...
2016
-
Alteration Type III
PROPOSED BPP FILING ON 25'-0" WIDE LOT ON WILLIAM AVENUE WITH (1) CURB CUT 13'-0" WIDE WITH (2) 2'-6" SPLAYS ON EACH ...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records