319-321 Powell Street, Brooklyn • Block 03780 • Lot 0021
29 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Mar 2, 2026 | 39551095X | RESOLVE | CLASS - 2 | AT THE TIME OF MY INSPECTION I OBSERVED SUPPORTED SCAFFOLD INSTALLED AT EXP #2 (FOR MASONRY WORK/STUCCO) ABOVE ADJ PR... | $5,000 | $5,000 | Jan 8, 2027 |
| Mar 2, 2026 | 39551105K | ACTIVE | CLASS - 2 | AT THE TIME OF MY INSPECTION OBSERVED CONSTRUCTION FENCE INSTALLED AT EXP#1/4 NOT MAINTAINED-MULTIPLE LOCATION ADDED ... | $1,000 | $1,000 | Jan 8, 2027 |
| Mar 2, 2026 | 39551106M | ACTIVE | CLASS - 2 | AT THE TIME OF MY INSPECTION OF ACTIVE 5 STORY NEW BUILDING I OBSERVED ONLY 2 FIRE EXTINGUISHERS ON SITE WITH ONE DIA... | $625 | $625 | Jan 8, 2027 |
| Mar 2, 2026 | 39551097J | RESOLVE | CLASS - 2 | AT THE TIME OF MY INSPECTION I OBSERVED SUPPORTED SCAFFOLD INSTALLED AT EXP#1/2 AND IN ELEVATOR PIT - SIDEWALK SHED A... | $1,250 | $1,250 | Jan 8, 2027 |
| Mar 2, 2026 | 39551102P | ACTIVE | CLASS - 2 | AT THE TIME OF MY INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP#1/4 -BIG AMOUNT OF GARBAGE/MATERIAL/EQUIPMENT , ... | $2,400 | $2,400 | Jan 8, 2027 |
| Mar 2, 2026 | 39551103R | ACTIVE | CLASS - 2 | AT THE TIME OF MY INSPECTION OF 5 STORY NEW BUILDING I OBSERVED BIG AMOUNTS OF GARBAGE/MATERIAL/EQUIPMENT SCATTERED A... | $1,250 | $1,250 | Jan 8, 2027 |
| Mar 2, 2026 | 39551104Z | RESOLVE | CLASS - 1 | AT THE TIME OF MY INSPECTION OF ACTIVE 5 STORY NEW BUILDING I OBSERVED NO HANDRAILS PROVIDED ON ALL FLOORS FROM 1ST T... | $2,500 | $2,500 | Jan 8, 2027 |
| Mar 2, 2026 | 39551096H | RESOLVE | CLASS - 2 | INADEQUATE SITE SAFETY PLAN AS PER 28-105.12.8 ALL WORK SHALL ADHERE TO SSP/SCOPE OF WORK-SITE SAFETY PLAN DOESN'T SH... | $0 | $0 | May 6, 2026 |
| Oct 8, 2025 | 39545722P | RESOLVE | CLASS - 2 | RESPONDENT FAIL TO COMPLY WITH THE COMMISSIONER ORDER, VIOLATING CONDITION WAS NOT CORRECTED. NO CERTIFICATE OF CORRE... | $0 | $0 | Jun 29, 2026 |
| Oct 8, 2025 | 39545719Y | RESOLVE | CLASS - 2 | RESPONDENT FAIL TO COMPLY WITH THE COMMISSIONER ORDER, VIOLATING CONDITION WAS NOT CORRECTED. NO CERTIFICATE OF CORRE... | $1,250 | $0 | Jun 29, 2026 |
| Oct 8, 2025 | 39545721N | RESOLVE | CLASS - 2 | RESPONDENT FAIL TO COMPLY WITH THE COMMISSIONER ORDER, VIOLATING CONDITION WAS NOT CORRECTED. NO CERTIFICATE OF CORRE... | $1,250 | $0 | Jun 29, 2026 |
| Aug 8, 2025 | 39543417J | RESOLVE | CLASS - 1 | AT THE TIME OF MY INSPECTION, I OBSERVED TELEHANDLER ON STREET AT EXPOSURE #1 WITH NO 4 FEET SOLID PLYWOOD BARRIER FR... | $5,000 | $5,000 | Apr 17, 2026 |
| Aug 8, 2025 | 39543419N | RESOLVE | CLASS - 1 | AT THE TIME OF MY INSPECTION OF A 5 STORY NEW BUILDING, I OBSERVED ACTIVE STEEL FRAMING UP TO THE 4 FLOOR, SUPPORTED ... | $1,250 | $1,250 | Apr 17, 2026 |
| Aug 8, 2025 | 39543420K | RESOLVE | CLASS - 1 | BC 3307.6.5.4 AT THE TIME OF MY INSPECTION OF A 5 STORY NEW BUILDING, I OBSERVED SIDEWALK SHED AT EXPOSURE #1 AND 4 W... | $5,000 | $5,000 | Apr 17, 2026 |
| Aug 8, 2025 | 39543416H | RESOLVE | CLASS - 1 | AT THE TIME OF MY INSPECTION OF A 5 STORY NEW BUILDING, I OBSERVED ACTIVE JOBSITE STEEL FRAMING UP TO THE 4 FLOOR, UP... | $2,500 | $2,500 | Apr 17, 2026 |
| Aug 8, 2025 | 39543418L | RESOLVE | CLASS - 1 | AT THE TIME OF MY INSPECTION OF A 5 STORY NEW BUILDING, I OBSERVED ACTIVE JOBSITE STEEL FRAMING UP TO THE 4 FLOOR, UP... | $0 | $0 | Apr 17, 2026 |
| Aug 1, 2025 | 39543116X | RESOLVE | CLASS - 2 | AT THE TIME OF MY INSPECTION OF A SIDEWALK SHED PROVIDED TO PROTECT MEMBERS OF THE PUBLIC I OBSERVED THERE WERE NO UN... | $2,400 | $2,400 | Apr 17, 2026 |
| Jul 8, 2025 | 39542080Z | ACTIVE | CLASS - 2 | AT TIME OF MY INSPECTION OBSERVED: SIDEWALK SHE INSTALLED AT EXPO# 1 VERTICAL COMPONENTS PLACED ON GREEN INFRASTRUCTU... | $10,000 | $10,000 | Sep 10, 2026 |
| Jul 8, 2025 | 39542074M | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED: PROPOSED 5 STORY NEW BUILDING CMU WORK AT 3RD FL. LEVEL STEEL COLUMN ERECTED AT 50 FE... | $2,500 | $2,500 | Dec 14, 2026 |
| Jul 8, 2025 | 39542075Y | ACTIVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED: PROPOSED 5 STORY NEW BUILDING CMU WORK AT 3RD FL. LEVEL STEEL COLUMN ERECTED AT 50 FE... | $2,400 | $2,400 | Dec 14, 2026 |
| Jul 8, 2025 | 39542076X | ACTIVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED: PROPOSED 5 STORY NEW BUILDING CMU WORK AT 3RD FL. LEVEL STEEL COLUMN ERECTED AT 50 FE... | $1,250 | $1,250 | Dec 14, 2026 |
| Jul 8, 2025 | 39542077H | ACTIVE | CLASS - 2 | BC 3303.4.8 MACHINERY. MECHANICAL EQUIPMENT AT STORAGE ZONE DOES NOT BARRICADE, SHIELDED TO PREVENT CONTACT BY PUBLIC... | $2,500 | $2,500 | Dec 14, 2026 |
| Jul 8, 2025 | 39542078J | ACTIVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED: PROPOSED 5 STORY NEW BUILDING CMU WORK AT 3RD FL. LEVEL STEEL COLUMN ERECTED AT 50 FE... | $2,500 | $2,500 | Dec 14, 2026 |
| Dec 17, 2024 | 39133053X | RESOLVE | CLASS - 2 | ATOI OBSERVED FOUNDATION WORK IN PROCESS 70% POURED REQUESTED APPROVED PLANS ARCH/EN NOT PROVIDED., MAINTAIN/DISPLAY ... | $1,250 | $1,250 | Jul 24, 2025 |
| Feb 6, 2023 | 39079167J | RESOLVE | CLASS - 2 | JOB SITE FNCE NT CONST/MNTND PURSNT TO SBSCTION: ATOI, THE ENTIRE RUN OF CONST FNCE HAS COLLAPSED INTO THE LOT AT EXP... | $1,000 | $0 | May 15, 2023 |
| Feb 6, 2023 | 39079166H | RESOLVE | CLASS - 2 | TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT: AT TIME OF INSPECTION 122' LINEAR FT OF POORLY MAINTAINED CO... | $1,250 | $0 | May 15, 2023 |
| Jan 11, 2018 | 35311475J | RESOLVE | CLASS - 2 | JOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION.NOTE: FENCE IS NOT CONSTRUCTED SECURLY SOME PLYWO... | $400 | $0 | Mar 5, 2018 |
| Feb 15, 2017 | 35219605R | RESOLVE | CLASS - 2 | JOB SITE FENCE NOT CONSTRUCTED SUBSECTION. AT THE TIME OF INSPECTION IT WAS OBSERVED THAT THE 8 FEET PLYWOOD/METAL FE... | $400 | $0 | Apr 3, 2017 |
| Mar 19, 1999 | 34195526Z | ACTIVE | Hazardous | FAILURE TO MAINTAIN. DEFECT IS: 1) INTERIOR FLOOR SLAB COLLAPSED THRU-OUT 1ST FL. 2) MASONRY WALL @ INTERIOR COLLAPSE... | $2,500 | $0 | May 10, 1999 |