Skip to content

ECB violations

319-321 Powell Street, Brooklyn • Block 03780 • Lot 0021

29 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Mar 2, 2026 39551095X RESOLVE CLASS - 2 AT THE TIME OF MY INSPECTION I OBSERVED SUPPORTED SCAFFOLD INSTALLED AT EXP #2 (FOR MASONRY WORK/STUCCO) ABOVE ADJ PR... $5,000 $5,000 Jan 8, 2027
Mar 2, 2026 39551105K ACTIVE CLASS - 2 AT THE TIME OF MY INSPECTION OBSERVED CONSTRUCTION FENCE INSTALLED AT EXP#1/4 NOT MAINTAINED-MULTIPLE LOCATION ADDED ... $1,000 $1,000 Jan 8, 2027
Mar 2, 2026 39551106M ACTIVE CLASS - 2 AT THE TIME OF MY INSPECTION OF ACTIVE 5 STORY NEW BUILDING I OBSERVED ONLY 2 FIRE EXTINGUISHERS ON SITE WITH ONE DIA... $625 $625 Jan 8, 2027
Mar 2, 2026 39551097J RESOLVE CLASS - 2 AT THE TIME OF MY INSPECTION I OBSERVED SUPPORTED SCAFFOLD INSTALLED AT EXP#1/2 AND IN ELEVATOR PIT - SIDEWALK SHED A... $1,250 $1,250 Jan 8, 2027
Mar 2, 2026 39551102P ACTIVE CLASS - 2 AT THE TIME OF MY INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP#1/4 -BIG AMOUNT OF GARBAGE/MATERIAL/EQUIPMENT , ... $2,400 $2,400 Jan 8, 2027
Mar 2, 2026 39551103R ACTIVE CLASS - 2 AT THE TIME OF MY INSPECTION OF 5 STORY NEW BUILDING I OBSERVED BIG AMOUNTS OF GARBAGE/MATERIAL/EQUIPMENT SCATTERED A... $1,250 $1,250 Jan 8, 2027
Mar 2, 2026 39551104Z RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION OF ACTIVE 5 STORY NEW BUILDING I OBSERVED NO HANDRAILS PROVIDED ON ALL FLOORS FROM 1ST T... $2,500 $2,500 Jan 8, 2027
Mar 2, 2026 39551096H RESOLVE CLASS - 2 INADEQUATE SITE SAFETY PLAN AS PER 28-105.12.8 ALL WORK SHALL ADHERE TO SSP/SCOPE OF WORK-SITE SAFETY PLAN DOESN'T SH... $0 $0 May 6, 2026
Oct 8, 2025 39545722P RESOLVE CLASS - 2 RESPONDENT FAIL TO COMPLY WITH THE COMMISSIONER ORDER, VIOLATING CONDITION WAS NOT CORRECTED. NO CERTIFICATE OF CORRE... $0 $0 Jun 29, 2026
Oct 8, 2025 39545719Y RESOLVE CLASS - 2 RESPONDENT FAIL TO COMPLY WITH THE COMMISSIONER ORDER, VIOLATING CONDITION WAS NOT CORRECTED. NO CERTIFICATE OF CORRE... $1,250 $0 Jun 29, 2026
Oct 8, 2025 39545721N RESOLVE CLASS - 2 RESPONDENT FAIL TO COMPLY WITH THE COMMISSIONER ORDER, VIOLATING CONDITION WAS NOT CORRECTED. NO CERTIFICATE OF CORRE... $1,250 $0 Jun 29, 2026
Aug 8, 2025 39543417J RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION, I OBSERVED TELEHANDLER ON STREET AT EXPOSURE #1 WITH NO 4 FEET SOLID PLYWOOD BARRIER FR... $5,000 $5,000 Apr 17, 2026
Aug 8, 2025 39543419N RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION OF A 5 STORY NEW BUILDING, I OBSERVED ACTIVE STEEL FRAMING UP TO THE 4 FLOOR, SUPPORTED ... $1,250 $1,250 Apr 17, 2026
Aug 8, 2025 39543420K RESOLVE CLASS - 1 BC 3307.6.5.4 AT THE TIME OF MY INSPECTION OF A 5 STORY NEW BUILDING, I OBSERVED SIDEWALK SHED AT EXPOSURE #1 AND 4 W... $5,000 $5,000 Apr 17, 2026
Aug 8, 2025 39543416H RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION OF A 5 STORY NEW BUILDING, I OBSERVED ACTIVE JOBSITE STEEL FRAMING UP TO THE 4 FLOOR, UP... $2,500 $2,500 Apr 17, 2026
Aug 8, 2025 39543418L RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION OF A 5 STORY NEW BUILDING, I OBSERVED ACTIVE JOBSITE STEEL FRAMING UP TO THE 4 FLOOR, UP... $0 $0 Apr 17, 2026
Aug 1, 2025 39543116X RESOLVE CLASS - 2 AT THE TIME OF MY INSPECTION OF A SIDEWALK SHED PROVIDED TO PROTECT MEMBERS OF THE PUBLIC I OBSERVED THERE WERE NO UN... $2,400 $2,400 Apr 17, 2026
Jul 8, 2025 39542080Z ACTIVE CLASS - 2 AT TIME OF MY INSPECTION OBSERVED: SIDEWALK SHE INSTALLED AT EXPO# 1 VERTICAL COMPONENTS PLACED ON GREEN INFRASTRUCTU... $10,000 $10,000 Sep 10, 2026
Jul 8, 2025 39542074M RESOLVE CLASS - 2 AT TIME OF INSPECTION OBSERVED: PROPOSED 5 STORY NEW BUILDING CMU WORK AT 3RD FL. LEVEL STEEL COLUMN ERECTED AT 50 FE... $2,500 $2,500 Dec 14, 2026
Jul 8, 2025 39542075Y ACTIVE CLASS - 2 AT TIME OF INSPECTION OBSERVED: PROPOSED 5 STORY NEW BUILDING CMU WORK AT 3RD FL. LEVEL STEEL COLUMN ERECTED AT 50 FE... $2,400 $2,400 Dec 14, 2026
Jul 8, 2025 39542076X ACTIVE CLASS - 2 AT TIME OF INSPECTION OBSERVED: PROPOSED 5 STORY NEW BUILDING CMU WORK AT 3RD FL. LEVEL STEEL COLUMN ERECTED AT 50 FE... $1,250 $1,250 Dec 14, 2026
Jul 8, 2025 39542077H ACTIVE CLASS - 2 BC 3303.4.8 MACHINERY. MECHANICAL EQUIPMENT AT STORAGE ZONE DOES NOT BARRICADE, SHIELDED TO PREVENT CONTACT BY PUBLIC... $2,500 $2,500 Dec 14, 2026
Jul 8, 2025 39542078J ACTIVE CLASS - 2 AT TIME OF INSPECTION OBSERVED: PROPOSED 5 STORY NEW BUILDING CMU WORK AT 3RD FL. LEVEL STEEL COLUMN ERECTED AT 50 FE... $2,500 $2,500 Dec 14, 2026
Dec 17, 2024 39133053X RESOLVE CLASS - 2 ATOI OBSERVED FOUNDATION WORK IN PROCESS 70% POURED REQUESTED APPROVED PLANS ARCH/EN NOT PROVIDED., MAINTAIN/DISPLAY ... $1,250 $1,250 Jul 24, 2025
Feb 6, 2023 39079167J RESOLVE CLASS - 2 JOB SITE FNCE NT CONST/MNTND PURSNT TO SBSCTION: ATOI, THE ENTIRE RUN OF CONST FNCE HAS COLLAPSED INTO THE LOT AT EXP... $1,000 $0 May 15, 2023
Feb 6, 2023 39079166H RESOLVE CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT: AT TIME OF INSPECTION 122' LINEAR FT OF POORLY MAINTAINED CO... $1,250 $0 May 15, 2023
Jan 11, 2018 35311475J RESOLVE CLASS - 2 JOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION.NOTE: FENCE IS NOT CONSTRUCTED SECURLY SOME PLYWO... $400 $0 Mar 5, 2018
Feb 15, 2017 35219605R RESOLVE CLASS - 2 JOB SITE FENCE NOT CONSTRUCTED SUBSECTION. AT THE TIME OF INSPECTION IT WAS OBSERVED THAT THE 8 FEET PLYWOOD/METAL FE... $400 $0 Apr 3, 2017
Mar 19, 1999 34195526Z ACTIVE Hazardous FAILURE TO MAINTAIN. DEFECT IS: 1) INTERIOR FLOOR SLAB COLLAPSED THRU-OUT 1ST FL. 2) MASONRY WALL @ INTERIOR COLLAPSE... $2,500 $0 May 10, 1999