DOB violations
11 Schenck Avenue, Brooklyn • Block 03920 • Lot 0016
6 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Apr 17, 2019 | 00263 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | Dec 13, 2019 |
| Apr 15, 2019 | 13681A | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | V*-DOB VIOLATION - DISMISSED | FULLY ENCLOSE PERIMETER OF THE PREMISES WITH AN 8FT CONSTRUCTION FENCE TO SECURE THE BLDG.NOTE: CONSTRUCTION FENCE AL... | Jan 28, 2022 |
| Apr 12, 2019 | 13679 | EGNCY-EMERGENCY NONE | V*-DOB VIOLATION - DISMISSED | FULLY DEMOLISH THE BUILDING AND GRADE SITE | Jan 27, 2022 |
| Feb 13, 2019 | FEU30501FF | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | FTM:FIRE OCCURED ON 1/22/19 AT ADJ PROP 13 SCHENCKAVE. BLDG SUFFERED STRUCT DMG APPROX 90% OF ROOF PART COLLAPSED@REA... | May 24, 2022 |
| Jan 22, 2019 | CER01RJ | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | AT TIME OF INSPECTION AT 2ND FLOOR LEVEL ROOF HAS COLLAPSED ONTO ATTIC WINDOWS OUT THROUGHOUT EXTENSIVE WATER AND SMO... | Dec 23, 2021 |
| Jan 22, 2019 | FEU30501FF | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | EMG WRK ORDER:DUE TO FIRE ON 1/22/19 ADJ PROP SUFFERED STRUCT DAMAGE APPROX 90% OF ROOF HAS PART COLLAP&50%OF ATTIC F... | May 24, 2022 |