Maintenance code violations
1049 Glenmore Avenue, Brooklyn • Block 04197 • Lot 0001
627 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Apr 24, 2006 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ..... 1st WINDOW FRAME FROM ... | 5D | Aug 2, 2006 |
| Apr 24, 2006 | B | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE ... | 5D | Jun 3, 2006 |
| Apr 24, 2006 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ... 1st CLOSET FROM WEST AT ... | 5D | Aug 2, 2006 |
| Apr 24, 2006 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ... CEILING, WEST W... | 5D | Jun 3, 2006 |
| Apr 24, 2006 | B | VIOLATION CLOSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR THAT IS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5D, ... | 5D | Jun 3, 2006 |
| Apr 24, 2006 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR .. 1st CLOSET FROM ... | 5D | Jun 3, 2006 |
| Apr 24, 2006 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ... CEILING, 1st DOOR FRAME ... | 5D | Aug 2, 2006 |
| Apr 24, 2006 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ... 1st RISER FROM SOUTH AT WEST WALL, 1st RADIATO... | 5D | Aug 2, 2006 |
| Apr 24, 2006 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ... 1st RADIATOR FROM NORTH AT EAST WALL IN THE 3r... | 5D | Aug 2, 2006 |
| Apr 24, 2006 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR .. SOUTH WALL, CEIL... | 5D | Jun 3, 2006 |
| Apr 18, 2006 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL-BUZZER - INTERCOM AT PUBLIC HALL, 1st STORY | — | May 28, 2006 |
| Apr 10, 2006 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 1C | May 6, 2006 |
| Feb 6, 2006 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL-BUZZER SYSTEM FROM 1ST STORY PUBLIC HALL TO 4 TH STOR... | — | Mar 18, 2006 |
| Feb 3, 2006 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 1C | Mar 1, 2006 |
| Oct 18, 2005 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL/BUZZER-INTERCOM SYSTEM; FROM BUILDING FRONT TO CONTRO... | 1FL | Nov 27, 2005 |
| Aug 30, 2005 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 5D | Sep 25, 2005 |
| Aug 29, 2005 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, 1st DOOR FRAM... | 5D | Dec 7, 2005 |
| Aug 29, 2005 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE BATHR... | 5D | Dec 7, 2005 |
| Aug 29, 2005 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 5D | Oct 8, 2005 |
| Aug 29, 2005 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM NO... | 5D | Dec 7, 2005 |
| Aug 29, 2005 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 4th... | 5D | Oct 8, 2005 |
| Aug 29, 2005 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL, 1st... | 5D | Dec 7, 2005 |
| Aug 29, 2005 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st WINDOW FRAM... | 5D | Dec 7, 2005 |
| Aug 29, 2005 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT W... | 5D | Dec 7, 2005 |
| Aug 29, 2005 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 5D | Oct 8, 2005 |
| Aug 29, 2005 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 3rd ROO... | 5D | Dec 7, 2005 |
| Jul 21, 2005 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL-BUZZER SYSTEM IN THE ENTIRE APARTMENT LOCATED AT APT ... | 1A | Aug 30, 2005 |
| Jul 12, 2004 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER IN THE BATHROOM LOCATED AT APT 5D, 4th... | 5D | Oct 20, 2004 |
| May 28, 2004 | B | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE ... | 5D | Jul 7, 2004 |
| May 28, 2004 | B | VIOLATION CLOSED | § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 4th STORY,... | 5D | Jul 7, 2004 |
| May 4, 2004 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL-BUZZER/INTERCOME SYSTEM AT FRONT AREAWAY | — | Aug 12, 2004 |
| Aug 12, 2003 | B | VIOLATION CLOSED | § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASHBASIN IN THE BATHROOM LOCATED AT APT 5B, 2nd STORY, 1st APARTM... | 5B | Sep 21, 2003 |
| Aug 12, 2003 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILI... | 5B | Sep 21, 2003 |
| Aug 8, 2003 | C | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITC... | 5B | Aug 19, 2003 |
| Aug 8, 2003 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH W... | 5B | Sep 17, 2003 |
| Aug 8, 2003 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ... | 5B | Sep 17, 2003 |
| Oct 22, 2002 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATH... | B5 | Dec 1, 2002 |
| Oct 22, 2002 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITC... | B5 | Dec 1, 2002 |
| Oct 22, 2002 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL AND INTERCOM SYSTEM AT FRONT AREAWAY, 1st STORY | — | Dec 1, 2002 |
| Oct 22, 2002 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ... | B5 | Dec 1, 2002 |
| Oct 22, 2002 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WEST WA... | B5 | Dec 1, 2002 |
| Oct 22, 2002 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ... | B5 | Dec 1, 2002 |
| Sep 9, 2002 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL-BUZZER SYSTEM FROM 1st STORY ENTRANCE TO IN THE ENTIR... | 2D | Oct 19, 2002 |
| May 23, 2002 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ... | 5B | Jul 2, 2002 |
| May 23, 2002 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ... | 5B | Jul 2, 2002 |
| May 23, 2002 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATH... | 5B | Jul 2, 2002 |
| Feb 6, 2002 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REMOVE THE TORN AND/OR LOOSE FLOOR COVERING , IN THE KITCHEN LOCATED AT APT 4-B, 2nd STORY, 2nd AP... | 4-B | Mar 18, 2002 |
| May 17, 2001 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITC... | 5B | Jun 26, 2001 |
| May 17, 2001 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS THROUGHOU... | 5B | Aug 25, 2001 |
| May 17, 2001 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SHEET ROCK CEILING IN THE BATHROOM L... | 5B | Jun 26, 2001 |