2780 Pitkin Avenue, Brooklyn
Brooklyn • Block 04235 • Lot 0025 • Zip: 11208
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 45 min 13 walking, 32 riding
- Fulton Street 52 min 13 walking, 39 riding
- Union Square 58 min 13 walking, 45 riding
- Grand Central 62 min 13 walking, 49 riding
- Penn Station 62 min 13 walking, 49 riding
- Times Square 63 min 13 walking, 50 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation May 4, 2026
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2025
-
HPD violation Jun 9, 2025
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
-
HPD violation Jan 28, 2025
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation Jan 21, 2025
Class C
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th ...
-
HPD violation Jan 21, 2025
Class C
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STO...
2024
-
HPD violation Apr 10, 2024
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2011
-
Alteration Type II
BOILER AND BURNER REPLACEMENT AND INSTALLATION OF NATURAL GAS AS AN ALTERNATE FUEL TO THE EXISTING #2 OIL .
-
Alteration Type III
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCC...
2005
-
DOB violation Jan 31, 2005
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2001
-
DOB violation Feb 27, 2001
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2000
-
DOB violation Feb 7, 2000
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1999
-
DOB violation Mar 16, 1999
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1995
-
DOB violation Aug 29, 1995
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1994
-
Hazardous
FAILURE TO MAINTAIN:DEFECT ARE:DEFECTIVE STAIR WAY TREADS AND BROKEN AND LOOSE TREADS FROM INNER COURT TO REAR HEAD R...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records