| Dec 3, 2021 | 321644342 | Demolition | SIGNED OFF | FULL DEMOLITION OF NYC DEP PRIMARY SLUDGE GALLERY AT 26TH WARD. | $0 | NYC DEP BEDC |
| Apr 2, 2021 | 321484050 | Demolition | SIGNED OFF | — | $0 | NYC DEP BEDC |
| Mar 15, 2021 | 321484069 | Alteration Type III | SIGNED OFF | FILING FENCE APPLICATION FOR THE INTERIM BLOWER BUILDING. NO CHANGE OF OCCUPANCY, USE OR EGRESS. | $0 | NYCDEP |
| Aug 23, 2017 | 321376319 | Alteration Type III | SIGNED OFF | HEREWITH FILING FOR TEMPORARY CONSTRUCTION FENCE AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | $0 | NYCDEP |
| Nov 20, 2016 | 321380849 | Demolition | SIGNED OFF | — | $0 | NYC DEP BEDC |
| Dec 15, 2015 | 321141313 | Alteration Type II | PLAN EXAM - DISAPPROVED | INSTALLATION OF MANUAL AND AUTOMATIC, SMOKE/HEAT DETECTION, SPRINKLER FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR ... | $9,600 | NYCDEP BEDC |
| Oct 28, 2015 | 321263137 | Demolition | APPLICATION PROCESSED - NO PLAN EXAM | THE INTERIM BLOWER BUILDING WILL BE DEMOLISHED WHEN THE PERMANENT BLOWERS ARE INSTALLED IN THE PUMP AND BLOWER HOUSE. | $0 | NYCDEP |
| Oct 28, 2015 | 321263128 | Demolition | APPLICATION PROCESSED - NO PLAN EXAM | THE EXISTING ENTRANCE BUILDING ON THE PRIMARY SLUDGE GALLERY WILL BE DEMOLISHED TO AVOID CONFLICT WITH INFLUENT PIPES... | $0 | NYCDEP |
| Oct 19, 2015 | 321259026 | Demolition | APPLICATION PROCESSED - NO PLAN EXAM | THE EXISTING AMMONIA BUILDING IS BEING DEMOLISHED TO MAKE SPACE FOR THE PST5, PSG AND MCC#25. DEP HAS DETERMINED THE ... | $0 | NYCDEP |
| Mar 21, 2011 | 320124995 | Alteration Type II | SIGNED OFF | FILING FOR THE INSTALLATION OF SECONDARY BACKFLOW PREVENTION DEVICES AT THE NYCDEP 26TH WARD WATER POLLUTION CONTROL ... | $89,000 | NYCDEP BUREAUWASTEWATERTREATMENT |
| Jan 28, 2010 | 310087722 | Alteration Type II | SIGNED OFF | INSTALLATION OF PLUMBING WORK AS SHOWN ON THE PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $50,000 | NYCDEP BureauWastewaterTreatment |
| Nov 18, 2009 | 310180069 | Alteration Type II | SIGNED OFF | EXCAVATION OF TRENCH FOR ACCESS TO PIPING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $20,000 | NYCDEP BUREAUWASTEWATERTREATMENT |
| Aug 10, 2006 | 301427105 | Alteration Type II | SIGNED OFF | INSTALL (2) NEW FUEL CELLS. NEW CONCRETE PADS FOR THE FULE CELLS AND COOLING UNITS. NEW FENCE AROUND PROJECT. CONNECT... | $360,000 | NYC DEP - BUREAU OF WASTERWATER |
| Jan 19, 2006 | 302060784 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALL TEMPORARY MOBILE BOILER, OIL BURNER, AND THREE (3) FUEL OIL TANKS PER PLANS. NO CHANGE IN EGRESS, OCCUPANCY O... | $5,000 | NYC DEPT OF ENVIRONMENTAL PROTEC |
| Oct 25, 2004 | 301851850 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF A SCAFFOLD, 70'LONG BY 45'HIGH, DURING CHIMNEY REPAIR. NO CHANGES IN USE,EGRESS, OR OCCUPANCY. | $0 | GOV 4 |