Flatlands Avenue, Brooklyn
Brooklyn • Block 04580 • Lot 0002 • Zip: 11208
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 6 days ago- Downtown Brooklyn 45 min 13 walking, 32 riding
- Fulton Street 52 min 13 walking, 39 riding
- Union Square 58 min 13 walking, 45 riding
- Grand Central 62 min 13 walking, 49 riding
- Penn Station 62 min 13 walking, 49 riding
- Times Square 63 min 13 walking, 50 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2024
-
DOB violation Sep 23, 2024
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Sep 23, 2024
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Sep 23, 2024
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2023
2022
2021
-
CLASS - 1
CLASS 1 ITEM: MISSING DLM AS NOW REQUIRED BY CODE CLASS 2 ITEMS: WATER IN PIT. INOPERATIVE EMERGENCY LIGHTING.
2019
-
DOB violation Nov 6, 2019
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Sep 6, 2019
ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2018
-
CLASS - 2
02X10,68B07,100Q07. 02X10- REPAIR THE AGENCY PHONE; 68B07-UPDATE MAINTENANCE LOG; 100B07-PROVIDE DATA STICKER FOR ONL...
-
DOB violation Apr 6, 2018
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2016
-
Alteration Type II
RECONSTRUCTION OF EFFLUENT CHAMBER AT NYC DEP SPRING CREEK AUXILIARY WPCP. WORK INCLUDES DEMOLITION OF EXISTING CONCR...
2014
2012
2011
-
Alteration Type I
INSTALLATION OF BOILER,NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2009
-
Alteration Type II
EST COST $20,000 INSTALLATION OF GAS PIPING FOR THREE BOILERS.FILING IN CONJUNCTION WITH JOB # 301339558
2005
-
Alteration Type III
Installation of 34' curb cut in conjunction with Alt I application #301339558. To be used by sewerage disposal trucks.
-
Alteration Type II
Installation of fuel oil storage tank. No change in use, egress or occupancy.
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records