ECB violations
823 Maple Street, Brooklyn • Block 04588 • Lot 0110
9 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jul 6, 2026 | 39556197J | ACTIVE | CLASS - 2 | OBSERVED SIDEWALK SHED PERMIT #B01279994 INSTALLED AT EXPO1 FOR PROPOSED 7STORY NB. UPON RESEARCH ON DOBRECORDS, NOTE... | $1,250 | $1,250 | Sep 9, 2026 |
| Jul 6, 2026 | 39556199N | ACTIVE | CLASS - 2 | ACTIVE 7STORY NB. SWS AT EXPO1 AND FENCE AT EXPO3 WAS UNMAINTAINED AS PER CODE. SWS ATOP NEIGHBORS DRIVEWAY AT CORNER... | $2,400 | $2,400 | Sep 9, 2026 |
| Jul 6, 2026 | 39556198L | ACTIVE | CLASS - 2 | ACTIVE 7STORY NB. UNDER ACTIVE SEVERE WEATHER ADVISORY ISSUED BY DOB FOR HIGH WINDS NOTED DEBRIS & TOOLS STORED NEAR ... | $1,250 | $1,250 | Sep 9, 2026 |
| Dec 20, 2025 | 39548195X | RESOLVE | CLASS - 2 | OBSERVED A SHED INSTALLED AROUND A THE ADJOINING BUILDINGS DRIVEWAY NOT CONFORMING TO DRAWINGS. VERTICAL MEMBERS ARE ... | $2,400 | $0 | Feb 25, 2026 |
| Dec 20, 2025 | 39548194Y | RESOLVE | CLASS - 2 | OBSERVED A SIDEWALK SHED INSTALLED NOT AS PER APPROVED DRAWINGS. SHED AT EXPO#2 IS NOT FULLY COVERING THE SIDEWALK B.... | $0 | $0 | Feb 25, 2026 |
| Dec 5, 2025 | 39547711Z | RESOLVE | CLASS - 1 | 3309.13 AT THE TIME OF MY INSPECTION OF A PROPOSED SEVEN-STORY BUILDING AT THE 6TH FLOOR LEVEL, I OBSERVED INADEQUATE... | $2,500 | $2,500 | Aug 4, 2026 |
| Dec 5, 2025 | 39547710R | RESOLVE | CLASS - 1 | BC 3309.14 AT THE TIME OF MY INSPECTION OF A PROPOSED SEVEN-STORY BUILDING AT THE 6TH FLOOR, PERFORMING CONCRETE POUR... | $2,500 | $2,500 | Aug 4, 2026 |
| Dec 5, 2025 | 39547652H | RESOLVE | CLASS - 1 | AT THE TIME OF MY INSPECTION OF A PROPOSED SEVEN-STORY BUILDING AT THE 6TH-FLOOR LEVEL, REVIEW OF THE SUPER LOG SHOWS... | $10,000 | $10,000 | Aug 4, 2026 |
| Dec 5, 2025 | 39547712K | RESOLVE | CLASS - 1 | 3301.2 AT THE TIME OF MY INSPECTION OF A PROPOSED SEVEN-STORY BUILDING AT THE 6TH FLOOR, PERFORMING CONCRETE POURING ... | $10,000 | $10,000 | Aug 4, 2026 |