22-24 East 96 Street, Brooklyn
Brooklyn • Block 04598 • Lot 0024 • Zip: 11212
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 45 min 22 walking, 23 riding
- Fulton Street 51 min 22 walking, 29 riding
- Penn Station 60 min 22 walking, 38 riding
- Times Square 61 min 22 walking, 39 riding
- Union Square 61 min 22 walking, 39 riding
- Grand Central 64 min 22 walking, 42 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Jun 25, 2026
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SUBFLOOR IN THE KITCHEN LOCATED...
-
HPD violation Jun 25, 2026
Class B
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON ...
-
HPD violation Jun 25, 2026
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SUBFLOOR IN THE BATHROOM LOCATE...
-
HPD violation Jun 25, 2026
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SUBFLOOR IN THE FOYER LOCATED A...
-
HPD violation Apr 22, 2026
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LO...
-
HPD violation Apr 22, 2026
Class C
567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF...
2025
-
CLASS - 1
WORK WITHOUT PERMIT. AT TIME OF INSPECTION, OBSERVED ILLEGAL ELECTRICAL WORK COMPLETED IN THE CELLAR. NOTED SPLICED W...
-
CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 ...
-
CLASS - 1
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLAINT MANNER. AT TIME OF INSPECTION, OBSERVED AT THE CELLAR LEVEL LARGE HO...
-
CLASS - 1
SUMMONS ISSUED FOR FAILURE TO MAINTAIN DUE TO WATER DAMAGED SHEETROCK CEILINGS AND WARPED, SLOPING AND OUT OF PLUMB F...
2015
-
DOB violation Mar 3, 2015
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2011
2010
-
CLASS - 2
FAILURE TO MAINTAIN IN CODE COMPLIANT MANNER NOTED:INTERIOR STAIRWELL(METAL) WITHH MARBLE A TILE OVERLAY PRESENT.PLAT...
2008
-
DOB violation Jan 3, 2008
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2006
-
DOB violation Jan 6, 2006
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2005
2004
-
Non-Hazardous
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE BUILDING DEPARTMENT RECORDS IN THAT 2 APARTMENTS OCCUPIED IN THE BASEMENT W...
1995
-
DOB violation Aug 29, 1995
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1994
-
DOB violation Jun 1, 1994
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1993
-
DOB violation Aug 16, 1993
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records