Kennedy King Playground, Brooklyn
Brooklyn • Block 04648 • Lot 0001 • Zip: 11212
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Downtown Brooklyn 45 min 22 walking, 23 riding
- Fulton Street 51 min 22 walking, 29 riding
- Penn Station 60 min 22 walking, 38 riding
- Times Square 61 min 22 walking, 39 riding
- Union Square 61 min 22 walking, 39 riding
- Grand Central 64 min 22 walking, 42 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Bus
Citi Bike
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
Alteration Type II
PS 219K- REPLACEMENT OF ROOFS, PARAPETS, EXTERIOR MASONRY REPAIR, REPLACEMENT OF WINDOWS,PLASTERING & PAINTING &a...
2025
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS P...
2024
2023
-
Alteration Type III
SF/PS219K - FOR TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH D...
-
Alteration Type III
SH/PS219K - FOR TEMPORARY CONSTRUCTION EQUIPMENT (SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB J...
-
Alteration Type III
FN/PS219K - FOR TEMPORARY CONSTRUCTION EQUIPMENT (FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB ...
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NO FIRE STOPPINGPER BC 712.3;27-345.NOTED:AT ELECTRICAL ROOM AT...
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER ...
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:ALL THE CLASSROOM DOORS(OLD)MISSING DOOR CLOSES THROUGHOU...
-
Alteration Type II
SCOPE OF WORK IS FOR THE SOLEY INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RE...
2022
-
Alteration Type II
SCOPE OF WORK IS FOR THE SOLEY INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RE...
-
CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER:NO FIRESTOPPING PER BC712.3;27-345.@BSMT LEVEL ELECTRICAL RMS(BOTH) ...
2019
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: NOTED: AT ROOF,CHIMNEY CAP IS MISSING AT CHIMNEY, CAUSING THE ...
2015
-
DOB violation Oct 1, 2015
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
-
DOB violation Oct 1, 2015
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
-
DOB violation Oct 1, 2015
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2009
-
DOB violation Jan 1, 2009
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
DOB violation Jan 1, 2009
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
DOB violation Jan 1, 2009
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records