Albany Avenue, Brooklyn • Block 04829 • Lot 0001

942 records

Violations issued by the Department of Buildings.

Issued Violation Type Category Description Disposed
Apr 29, 2026 26-01161 C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #B00621114-I1 ON 11/18/25. CONTRACTOR WITHDRAWAL
Apr 29, 2026 26-01146 C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #310103553 ON 8/19/2020 DUE TO CONTRACTOR WITHDRAWAL
Nov 14, 2025 01381 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 01380 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 00549 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 01382 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 00553 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 01378 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 00551 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 00550 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 00552 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 01379 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Jun 3, 2025 SR30901XN C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED LARGE STEP CRACKS ON EXPOSURE 3, SOUTH ELEVATION IN M...
Oct 9, 2024 LL0901AK C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE EMERGENCY WORK ORDER DUE TO MASONRY CORNER DISPLACEMENT. ALONG THE NORTH EAST CORNER FROM 2NDFL TO TOP OF PARAPET WAL...
Sep 23, 2024 00584 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION Apr 4, 2025
Sep 23, 2024 01468 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Sep 23, 2024 01469 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Sep 23, 2024 00582 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION Apr 4, 2025
Sep 23, 2024 01470 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Sep 23, 2024 00586 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION Apr 4, 2025
Sep 23, 2024 00583 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION Apr 4, 2025
Sep 23, 2024 01466 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Sep 23, 2024 00585 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
Sep 23, 2024 01467 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Sep 10, 2024 LL0901AK C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE EMERGENCY WORK ORDER DUE TO MASONRY CORNER DISPLACEMENT ALONG THE NE CORNER FROM 2FL TO TOP OF PARAPET WALL. REMEDY:I...
Jun 23, 2024 00618 EARCX-FAILURE TO SUBMIT EER NONE V*-DOB VIOLATION - DISMISSED FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) Sep 27, 2024
Nov 6, 2023 911306 FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE CYCLE 9A UNSAFE REPORT FILED
Nov 6, 2023 911305 FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE CYCLE 9A UNSAFE REPORT FILED
Oct 11, 2023 911291 FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE CYCLE 9A UNSAFE REPORT FILED
Oct 9, 2023 911290 FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE CYCLE 9A UNSAFE REPORT FILED
Aug 15, 2023 911224 FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE CYCLE 9A UNSAFE REPORT FILED
Aug 2, 2023 911211 FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE CYCLE 9A UNSAFE REPORT FILED
Jun 30, 2023 02850 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 02849 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 02278 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 03983 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 01623 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 01622 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 01624 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 01011 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION Apr 3, 2025
Jun 30, 2023 02198 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 01066 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 04504 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION Mar 14, 2025
Jun 30, 2023 03754 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION Mar 14, 2025
Jun 30, 2023 00469 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 02851 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 00470 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 03981 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 00471 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION Apr 3, 2025
Jun 30, 2023 03371 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION