Skip to content

DOB violations

Camba Gardens 2, Brooklyn • Block 04829 • Lot 0005

8 records

Violations issued by the Department of Buildings.

Issued Violation Type Category Description Disposed
Jan 10, 2024 00189 AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE V*-DOB VIOLATION - DISMISSED FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION Sep 25, 2025
Feb 16, 2023 RW30919BH C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE REQUEST ADDITIONAL INFORMATION.RESPNDNT IS REQ TO PROVDE A SGNED&SEALD LETTER ALNG W/DTAILD CALCLTIONS,DRWNGS FOUNDTI...
Jan 4, 2023 23-00019 E-ELEVATOR ELEVATORREQUIRED V-DOB VIOLATION - ACTIVE ELEVATOR SUSTAINED WATER DAMAGE DUE TO SPRINKLER PIPE BURST. CEASE USE
Feb 21, 2022 910464 FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE CYCLE 9A UNSAFE REPORT FILED
Mar 27, 2020 9028/676868 E-ELEVATOR ELEVATORREQUIRED V*-DOB VIOLATION - Resolved Mar 17, 2021
Mar 27, 2020 9028/676867 E-ELEVATOR ELEVATORREQUIRED V*-DOB VIOLATION - Resolved Mar 17, 2021
Mar 27, 2020 9028/676869 E-ELEVATOR ELEVATORREQUIRED V*-DOB VIOLATION - Resolved Mar 17, 2021
Oct 1, 2019 00883 RWNRF-RETAINING WALL NONE V-DOB VIOLATION - ACTIVE FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09