3214 Church Avenue, Brooklyn
Brooklyn • Block 04886 • Lot 0007 • Zip: 11226
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Downtown Brooklyn 45 min 22 walking, 23 riding
- Fulton Street 51 min 22 walking, 29 riding
- Penn Station 60 min 22 walking, 38 riding
- Times Square 61 min 22 walking, 39 riding
- Union Square 61 min 22 walking, 39 riding
- Grand Central 64 min 22 walking, 42 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Aunts Et Uncles
No description yet
Ciao Bella Coffee
Neighborhood coffee shop brewing up cortados & chai lattes in warm quarters with funky decor.
Prime Grind coffee & espresso
Prime Grind coffee & espresso is a cozy cafe in Brooklyn offering a wide variety of specialty coffees and delicious p...
Drip Beverage Lounge
Drip Beverage Lounge is a cozy cafe in Brooklyn offering a variety of specialty coffee drinks, teas, and baked goods....
The Rogers Garden
Funky, convivial bar with a courtyard garden offering unique cocktails, draft beer & finger foods.
Back Home Bakery
No description yet
Bake & Things Restaurant
No description yet
Exquisite Express
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
2024
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
2023
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
2017
-
Alteration Type II
INSTALL NEW HIGH PRESSURE GAS-FIRED BOILER PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
2015
2008
-
Non-Hazardous
36. FULTON V.T BOILER 10HP NB 84025 1999 36 REFERENCED REPLACEMENT HIGH PRESSURE STEAM BOILER IS NOT REGISTERED ON TH...
2005
-
Non-Hazardous
36/50A/50B/50C FULTON V.T BOILER 10HP NB 84025 GAS 1999 36 RECENTLY INSTALLED REPLACEMNT BOIELR IS NOT REGISTED PRODU...
2003
-
Alteration Type II
REPLACE DRY CLEANING MAACHINE IN EXISTIN G STORE (U.G.6). NO CHANGE IN EGRESS, OCCUPANCY OR USE UN DER THIS APPLICATION
1999
1991
-
Non-Hazardous
17B,32 SAFETY VALVE INOPERATIVE MANUALLY TO REPLACE BY NEW ONE.
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records