1565 New York Avenue, Brooklyn
Brooklyn • Block 05008 • Lot 0011 • Zip: 11210
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 45 min 22 walking, 23 riding
- Fulton Street 51 min 22 walking, 29 riding
- Penn Station 60 min 22 walking, 38 riding
- Times Square 61 min 22 walking, 39 riding
- Union Square 61 min 22 walking, 39 riding
- Grand Central 64 min 22 walking, 42 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Jul 9, 2026
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation Jul 9, 2026
Class B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ...
-
HPD violation Jul 9, 2026
Class B
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM...
-
HPD violation Jul 9, 2026
Class C
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd ...
2024
-
HPD violation Mar 18, 2024
Class A
§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR...
-
HPD violation Mar 18, 2024
Class C
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) THROUGHOUT THE PUBLIC AREAS IN AC...
2023
2022
-
CLASS - 1
CLASS 1: 97.X.10 RESTORE TO SERVICE. CLASS 2: 40.P.16 NO ACCESS TO MOTOR ROOM PROVIDE ACCESS. 97.D.6 CAR IS PARKED IN...
-
Alteration Type II
INSTALLATION OF SMOKE, HEAT, CO AND SPRINKLER MONITORING WORK IN CONJUNCTION WITH NEW BUILDING, JOB# 321836064
2021
-
CLASS - 2
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT.NOTED:AT THE TIME OF MY INSPECTION OF ACTIVE 6 STOR...
-
CLASS - 2
BC 3303.7.2 FIRE EXTINGUISHERS NOTED:AT THE TIME OF MY INSPECTION OF ACTIVE 6 STORY NEW BUILDING CONSTRUCTION JOBSITE...
-
Alteration Type III
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
-
Alteration Type III
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020
-
CLASS - 1
3314 FAILURE TO MAINTAIN DAILY INSPECTION RESPORT FOR A SUPPORTED SCAFFOLD.AT THE TIME OF INSPECTION I OBSERVED A SUP...
-
CLASS - 1
3303.7.2 FIRE EXTINGUISHER NOT MAINTAINED ACCORDING TO NYC FIRE CODE.AT THE TIME OF INSPECTION I OBSERVED MULTIPLE FI...
-
CLASS - 1
BC330747-WORK OR STORAGE ZONES.AT THE TIME OF INSPECTION OF A 6 STORY NB ACTIVE WORK OBSERVED UNSAFE MATERIAL/EQUIPEM...
2018
2007
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records