Chiarantano Playground, Brooklyn
Brooklyn • Block 05022 • Lot 0002 • Zip: 11203
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 45 min 22 walking, 23 riding
- Fulton Street 51 min 22 walking, 29 riding
- Penn Station 60 min 22 walking, 38 riding
- Times Square 61 min 22 walking, 39 riding
- Union Square 61 min 22 walking, 39 riding
- Grand Central 64 min 22 walking, 42 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371(J...
-
CLASS - 2
EXIT DOOR NOT SELF CLOSING.NOTED:AT 3RD FL STAIR E 2ND FL HALLWAY SMOKE DOOR NEAR RM 226 1ST FL GYM,EXIT C,HALLWAY SM...
2025
2024
-
CLASS - 2
REISSUE#35673082R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT TIME OF MY INSPECTION I OBSERVED AT ...
2023
-
Alteration Type II
REPLACE DOMESTIC HOT WATER HEATER AS PART OF LIMITED SCOPE PROJECT.
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT BASEMENT ELECTICAL RM ABOVE DOOR 2'L VERTICAL CRACK IN...
2022
-
CLASS - 2
REISSUED35502795K:EXIT DOOR NOT SELFCLOSING.NOTED:@3FL NEAR RM317&324@2FL BY EXIT STAIRC@1FL BY SECURITY DESK.SMOKE/H...
2021
-
Alteration Type II
EXTERIOR MASONRY REPOINTING, REPAIR MASONRY CONTROL JOINTS, REPAIR PARAPET WALLS, REPAIR ROOFING MEMBRANE AND FLASHING.
2020
-
CLASS - 1
NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS...
-
Alteration Type III
SH\PS109K - SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORA RY CONSTRUCTION EUIPMENT (SHED), IN CO...
-
Alteration Type III
SF/PS109X-FOR TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD),SUBMITTING ON BEHALF OF CONTRACTOR IN CONJUNCTION WITH DOB ...
-
Alteration Type III
FN\PS109K - SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORA RY CONSTRUCTION EUIPMENT (FENCE), IN C...
2019
-
New Building
P.S./I.S.395; STRUCTURAL AND FOUNDATION WORK FOR NEW SCHOOL BUILDING AS PER PLANS.
2018
-
DOB violation Dec 5, 2018
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Dec 5, 2018
E-ELEVATOR ELEVATORREQUIRED
2017
-
DOB violation Jan 3, 2017
ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
-
DOB violation Jan 3, 2017
ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
-
DOB violation Dec 23, 2016
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Dec 23, 2016
E-ELEVATOR ELEVATORREQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records