188-198 Parkside Avenue, Brooklyn • Block 05054 • Lot 0011
16 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Feb 28, 2023 | 39080410Z | ACTIVE | CLASS - 2 | GAS VENT ON BURNER NEEDS TO BE HARD PIPED, BACKFLOW PREVENTOR LEAKING, NO STORAGE IN BOILER ROOM, COIL PLATE LEAKING ... | $2,500 | $0 | May 10, 2023 |
| Feb 28, 2023 | 39080411K | ACTIVE | CLASS - 2 | FOUND PEERLESS ECT-06 SERIAL# 502734 20051 CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION | $2,500 | $0 | May 10, 2023 |
| Nov 13, 2018 | 39000733K | RESOLVE | CLASS - 2 | SEWER PIPE LEAKING LEFT OF BOILER-CHIMNEY BASE DOOR IS DEFECTIVE | $625 | $0 | Aug 5, 2019 |
| Nov 13, 2018 | 39000734M | RESOLVE | CLASS - 2 | BOILER FLUE PLATES LEFT SIDE HAVE DEFECTIVE BOLTS+GASKETS-STEAM RETURN REAR OF BOILER LEAKING-GAS METER ROOM HAS HOLE... | $312 | $0 | Aug 5, 2019 |
| Aug 20, 2013 | 34983963Y | ACTIVE | CLASS - 2 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. FOR ALT II JOB#320247434 PERMIT ... | $530 | $0 | Dec 30, 2013 |
| Aug 31, 2009 | 32066861M | RESOLVE | CLASS - 2 | 32A50A50B. 32A WIRES ON WATER PUMP MUST BE HARDWIRED. 50A FLU PIPE NEEDS CLEAN OUT EVERY 15FT. 50B CELING ABOVE BOILE... | $0 | $0 | Oct 26, 2009 |
| Sep 29, 2008 | 34686846Y | RESOLVE | CLASS - 1 | WORK W/O A PERMIT WORK NOTED AT CELLAR LEVEL PREMISES ERECTED FULL HEIGHT PARTITIONS CREATING 5 ROOMS 3 ROOMS USE AS ... | $0 | $0 | Dec 18, 2008 |
| Sep 29, 2008 | 34686845M | RESOLVE | CLASS - 1 | OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BLDG DEPT RECORDS C OF O 169794 ISSUED 3/17/60 INDICATES PREMISES... | $2,400 | $0 | Dec 18, 2008 |
| Sep 29, 2008 | 34686847X | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER DEFECT NOTED AT CELLAR LEVEL 2 WOOD JOIST FAULTY DEFECTIVE BROKEN... | $250 | $0 | Dec 18, 2008 |
| Jun 21, 2006 | 32049545X | RESOLVE | Hazardous | B4B,50D,32A,50E,10A,50F,50A,50G,50B,50C 50A-OIL TANK LEAKING NEED TO BE TESTED. 50B-SEPERATE CONTROLLS FROM 1/4" LINE... | $2,500 | $0 | Oct 16, 2006 |
| Feb 8, 2005 | 32047062M | RESOLVE | Hazardous | 3C/B4B 51/6A 50A/21B PEERLESS C.L. BOILER DOMESTIC HOT WATER SUPPLY OIL-FIRED 3C COLLAPSED FLUE PIPE. FLUE GAS EMISSI... | $400 | -$25 | Feb 8, 2006 |
| Feb 8, 2005 | 32047061K | RESOLVE | Non-Hazardous | FULTON V.T. BOILER, 10 HP, NB 40009, OIL 1981 BQ9 (27-147) REFERENCED BOILER WAS INSTALLED AT THE CITED LOCATION AND ... | $180 | $0 | Apr 18, 2005 |
| Feb 8, 2005 | 32047063Y | RESOLVE | Non-Hazardous | 50A/50B 50C/50D 34A/38 48AB PEERLESS C.L. BLR. LP STEAM, OIL-FIRED 50A) EXPOSED CONTROL INSTRUMENT SWITCH GEAR ON BOI... | $350 | -$25 | Feb 8, 2006 |
| Oct 28, 1998 | 32016566Y | RESOLVE | Non-Hazardous | 3C,49. 3C-FLUE PIPE COLLAPSED. 49-NUST FIX COLLAPSING FLUE PIPE & RESEAL INTO CHIMNEY, REPLACE BROKEN BLOWDOWN VALVE ... | $400 | $0 | Dec 14, 1998 |
| Oct 28, 1998 | 32016565M | RESOLVE | Non-Hazardous | 3C,49. 3C-FLUE PIPE COLLAPSED. 49-MUST FIX COLLAPSING FLUE PIPE & RESEAL PIPE INTO CHIMNEY. MUST INSTALL BLOWDOWN PIP... | $400 | $0 | Dec 14, 1998 |
| Oct 23, 1998 | 32016494Y | RESOLVE | Non-Hazardous | 18Q,18B,49,.1 LWCUT OUT RELEIGH SWITCH NOT CONNECTED TO RESTORE. 2 FLUE PIPE DAMPER FALL DOWN TO REFIL PROPERLU 3 HAN... | $0 | $0 | Mar 24, 1999 |