Maintenance code violations
2148-2162 Bedford Avenue, Brooklyn • Block 05086 • Lot 0050
1,446 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Feb 22, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | A4S | Mar 29, 2022 |
| Feb 22, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH AND EAST ... | A4S | Mar 29, 2022 |
| Feb 22, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE SINK AND BASE CABINET ASSEMBLY IN THE BATHROOM LOCATED AT APT A4S, 1st S... | A4S | Mar 29, 2022 |
| Feb 22, 2022 | C | VIOLATION CLOSED | § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE BATHTUB IN THE BATHROOM LOCATED AT APT A4S, 1st STORY, 1st APARTME... | A4S | Feb 28, 2022 |
| Feb 22, 2022 | C | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING ,EAST W... | A4S | Feb 28, 2022 |
| Feb 22, 2022 | C | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM... | A4S | Feb 28, 2022 |
| Feb 22, 2022 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE TREADS ONE TO EIGHT FROM BOTT... | — | Feb 28, 2022 |
| Feb 22, 2022 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 50 LB. RUBBER ROOF SO AS TO PREVENT ... | — | Feb 28, 2022 |
| Feb 22, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILED FLOOR AT PUBLIC HALL, ... | — | Mar 29, 2022 |
| Feb 22, 2022 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, ... | — | May 28, 2022 |
| Feb 22, 2022 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT THE CEILI... | — | Feb 28, 2022 |
| Feb 22, 2022 | C | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT PUBLIC HALL, 5th STORY, SECTION ''NOR... | — | Feb 28, 2022 |
| Feb 22, 2022 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS AT... | — | May 28, 2022 |
| Feb 22, 2022 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, ... | — | May 28, 2022 |
| Feb 22, 2022 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT THE CEILN... | — | Feb 28, 2022 |
| Feb 22, 2022 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT THE CEILI... | — | Feb 28, 2022 |
| Feb 22, 2022 | C | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AND ALL WALLS AT THE BULK HEAD , 5th STO... | — | Feb 28, 2022 |
| Feb 22, 2022 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SKYLIGHT AT THE BULKHEAD AT THE SOUTH SECTION OF THE BUILD... | — | Feb 28, 2022 |
| Feb 7, 2022 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | E2S | Mar 3, 2022 |
| Feb 7, 2022 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | E2S | Mar 3, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 3CS, 3... | 3CS | Mar 14, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS I... | 3CS | Mar 14, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN ... | 3CS | Mar 14, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN BATH TUB DRAIN PIPE LINE IN THE BATHROOM LOCATED... | 3CS | Mar 14, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE 1st CLOSET FROM... | E2S | Mar 14, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE EAST WALL, 1st WINDOW FRAME FROM NORTH AT EAST W... | E2S | Mar 14, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, CEIL... | E2S | Mar 14, 2022 |
| Feb 7, 2022 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST... | E2S | May 13, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FR... | 3CS | Mar 14, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST... | 3CS | Mar 14, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT... | 3CS | Mar 14, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BASE CABINET AT WEST WALL IN THE KIT... | 3CS | Mar 14, 2022 |
| Feb 7, 2022 | C | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURI... | E2S | Mar 3, 2022 |
| Feb 7, 2022 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | E2S | Mar 3, 2022 |
| Feb 7, 2022 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT ... | E2S | Mar 3, 2022 |
| Feb 7, 2022 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | E2S | Mar 3, 2022 |
| Feb 7, 2022 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT ... | E2S | Mar 3, 2022 |
| Feb 7, 2022 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | E2S | Mar 3, 2022 |
| Feb 7, 2022 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT ... | E2S | Mar 3, 2022 |
| Feb 7, 2022 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT ... | E2S | Mar 3, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BA... | 3CS | Mar 14, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, CEIL... | E2S | Mar 14, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, CEIL... | E2S | Mar 14, 2022 |
| Feb 7, 2022 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUT... | E2S | May 13, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | E2S | Mar 14, 2022 |
| Feb 7, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE 1st CLOSET FROM EAST AT SOUTH WALL WALL, 1st CLO... | E2S | Mar 14, 2022 |
| — | I | VIOLATION DISMISSED | §27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESU... | — | — |
| Jan 27, 2022 | C | VIOLATION CLOSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND WEST WALL APPROXI... | E1 | Feb 22, 2022 |
| Jan 27, 2022 | A | VIOLATION CLOSED | § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE PRIVATE HALLWAY... | A4S | May 2, 2022 |
| Jan 27, 2022 | B | VIOLATION CLOSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT E3S, 5th STORY, 1st APARTMENT FROM E... | E3S | Mar 3, 2022 |