1 Duryea Place, Brooklyn • Block 05132 • Lot 0080

53 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Aug 15, 2025 39543699R ACTIVE CLASS - 2 OBSERVED PROPOSED 7-STORY MIXED-USE BUILDING, SITE INACTIVE. FENCE INTACT BUT LACKING ADEQUATE POSTED PERMITS AND INF... $6,250 $0 Oct 22, 2025
Jan 29, 2025 39536417Y ACTIVE CLASS - 2 OBSERVED A SIDE WALK SHED INSTALLED AS OHP ON EXPO#3 . DEPARTMENT RECORDS SHOWS SHED PERMIT EXPIRED ON 1/03/2022. AND... $6,250 $6,250 Apr 9, 2025
Jan 29, 2025 39536418X ACTIVE CLASS - 2 OBSERVED AROUND EXPO#3 THE CONDITIONS OF THE CONSTRUCTION FENCE NOT AS PER B.C 3307.7.7. THE CONSTRUCTION FENCE PANEL... $5,000 $5,000 Apr 9, 2025
Jan 10, 2024 39524674R RESOLVE CLASS - 2 CONSTRUCTION SUPERINTENDENT NOT INFORMED DOB FOR UNSAFE CONDITIONS AT DEMOLITION SITES-MISSING TEMPORARY SUPPORT FOR ... $5,030 $0 Mar 16, 2027
Jan 10, 2024 39524689J ACTIVE CLASS - 1 ATOI I OBSERVED CONTRACTOR FAILURE TO COMPLY WITH DM -SEQUENCE.STAGE 35 REFLECTS THAT CONTRACTOR SHALL INSTALL TEMP. ... $2,530 $2,530 Feb 16, 2027
Dec 18, 2023 39524200P RESOLVE CLASS - 2 SUPPORTED PIPE SCAFFOLD NOT MAINTAINED AS PER CODE. OBSERVED SUPPORTED PIPE SCAFFOLD INSTALLED AROUND ALL EXPOSURES N... $2,500 $0 Oct 8, 2024
May 9, 2023 39516330N RESOLVE CLASS - 2 OBSERVED EXCESSIVE DEBRIS ON 1ST FLOOR, DEBRIS CONSISTING OF WOOD, STEEL REBAR, GARBAGE BAGS AND OTHER DEBRIS AND MAT... $0 $0 Jul 19, 2023
May 9, 2023 39516331P RESOLVE CLASS - 2 FAILURE TO MAINTAIN SAFETY MEASURS. OBSERVED 1ST FLOOR SLAB IS PARTIAL DEMOLISHED. OBSERVED NO SAFETY MEASURES IN PLA... $0 $0 Jul 19, 2023
Mar 21, 2023 39514383H RESOLVE CLASS - 1 FAILURE TO MAINTAIN SAFETY MEASURES. OBSERVED WORKERS DEMOLISHING ROOF BULKHEAD AND USING DEBRIS CHUTE NEXT TO INADEQ... $2,500 $0 Apr 12, 2024
Dec 21, 2022 39510627R ACTIVE CLASS - 2 INADEQUATE LIGHTING-BC3307.6.4.8 I OBSERVED 2 STORY CLOSED JOBSITE UNDERGOING FULL DEMOLITION, WITH SIDEWALK SHED(SWS... $2,400 $2,400 Jun 20, 2023
Dec 20, 2022 39510608L RESOLVE CLASS - 2 2 STORY BANK UNDERGOING FULL DM, CLOSED SITE, WITH SCAFFOLD(SF) AT EXP1, 2,3 AND 4. SF DEBRIS NETTING IS LOOSE AND NO... $0 $0 Mar 1, 2023
Aug 24, 2022 39505497L RESOLVE CLASS - 1 I OBSERVED SUPPORTED PIPE SCAFFOLD AT EXP. # 1, 2 AND 4 WITH DEBRIS NETTING NO SECURELY ATTACHED TO THE PIPE SCAFFOLD... $625 $625 Jan 25, 2024
Aug 15, 2022 39505043R RESOLVE CLASS - 2 NOTE: AT THE TIME OF INSPECTION OBSERVED A FULLY FENCED DEMO SITE CLOSED, NO CONSTRUCTION ACTIVITY. ALSO OBSERVED IN ... $625 $625 Apr 3, 2023
Aug 15, 2022 39505042P RESOLVE CLASS - 2 NOTE: OBSERVED A SIDEWALK SHED WITH SUPPORTED SCAFFOLD ON TOP ( MORE THAN 40FT HEIGHT) AT EXPOSURE1,2,3,4. OBSERVED I... $625 $625 Apr 3, 2023
Aug 15, 2022 39505041N ACTIVE CLASS - 2 NOTE: OBSERVED A SIDEWALK SHED AT EXP1, 2, 3, 4 & PEDESTRIAN WALKING UNDER IT. ALSO OBSERVED SIDEWALK SHED HAVE MISSI... $2,400 $2,400 Apr 3, 2023
Aug 10, 2022 39504844M ACTIVE CLASS - 2 AT THE TIME OF MY INSPECTION OBSERVED APPROXIMATELY 60 FEET OF SIDEWALK SHED AT EXP#1 AND 90 FEET OF SIDEWALK SHED AT... $2,400 $2,400 Apr 3, 2023
Apr 5, 2022 35646501Z ACTIVE CLASS - 2 PEDESTRIAN PROTECTION DOESNT MEET CODE SPECS.NOTE:ATO MY INSP OBSERVEDSWS W/NO LIGHTING PROVIDED UNDERSIDE TO PROTECT... $1,250 $1,250 Nov 7, 2022
Mar 23, 2022 35639836P ACTIVE CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS.AT THE TIME OFMY INSPECTION OF A SIDEWALK SHED I OBSERVED THA... $1,250 $1,250 Aug 10, 2022
Feb 22, 2022 35645864N ACTIVE CLASS - 1 BC3314.1 UNSAFE SUPPORTED SCF NOTE ATOI I OBSERVED SUPPORTED SCF IN PLACE W/FOLLOWING UNSAFE&HAZARDOUS CONDITIONS (1)... $2,500 $2,500 Jan 12, 2023
Feb 17, 2022 35645624Y RESOLVE CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION.NOTE:AT TIME OF INSPECTION OBSERVED SIDEWALK SHED IN PLACE LIG... $0 $0 Sep 30, 2022
Feb 17, 2022 35645852X RESOLVE CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE.EXPIRED PERMIT.NOTE:AT TIME OF INSPECTION OBSERVED SIDEWALK SHED IN PLACE RE... $1,250 $1,250 Sep 30, 2022
Feb 17, 2022 35645623M ACTIVE CLASS - 1 BC3314.1 UNSAFE SUPPORTED SCAFFOLD.NOTE:AT TIME OF INSPECTION OBSERVED SUPPORTED PIPE SCAFFOLD IN PLACE DEBRIS NETTIN... $1,250 $1,250 Sep 30, 2022
Feb 17, 2022 35645851Y RESOLVE CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT.NOTE:AT TIME OF INSPECTION OBSERVED SUPPORTED PIPE SCAFFOLD I... $1,250 $1,250 Sep 30, 2022
Feb 17, 2022 35645850M RESOLVE CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT SITE EXPIRED PERMIT.NOTE:AT TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE IN PLACE.... $625 $625 Sep 30, 2022
Jan 18, 2022 35641261X RESOLVE CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ONSITE EXPIRED PERMIT.NOTE:AT TIME OFMY INSPECTION OBSERVED NOT ACTIVE CONSTRUCTION ... $1,250 $1,250 Jun 1, 2022
Jan 18, 2022 35641262H ACTIVE CLASS - 2 BC 3307.6.4.8 LIGHTING NOTE:AT THE TIME OF MY INSPECTION I OBSERVED APPROXIMATELY 15 FEET OF SIDEWALK SHED AT EXPOSUR... $1,250 $1,250 Jun 1, 2022
Oct 19, 2021 35632187M ACTIVE CLASS - 2 LIGHTING.NOTE-ATOI I OBSERVED LIGHTING FOR SWS WASNT OPERATING&WAS VERY DARK.THIS CREATES UNSAFE CONDITION FOR PEDEST... $3,125 $3,125 Mar 2, 2022
Oct 16, 2021 35632153Y ACTIVE CLASS - 1 BC3314.8 INADEQUATE DEBRIS NETTING.AT TIME OF INSPECTION RESPONDING TO COMPLAINT OBSERVED SUPPORTED PIPE SCAFFOLD ERE... $2,500 $2,500 Feb 23, 2022
May 27, 2021 35662177X ACTIVE CLASS - 1 FAILURE TO PROMPTLY NOTIFY THE DEPT OF AN ACCIDENT THAT OCCURED ON A CONSTRUCTION SITE.NOTE A THE TIME OF INSPECTION ... $25,000 $25,000 Apr 5, 2023
May 27, 2021 35575576H RESOLVE CLASS - 1 FAILURE TO INSTITUTE AND MAINTAIN ADEQUATE SAFETY MEASURES NOTE AT THE TIME OF MY INSPECTION RESPONDING TO A COMPLAIN... $0 $0 Oct 24, 2022
May 27, 2021 35575582Y ACTIVE CLASS - 1 CONSTRUCTION SUPERINTENDENT FAILED TO IMMEDIATELY NOTIFY THE DEPARTMENT OF CONDITIONS.NOTE:AT THE TIME OF INSPECTION ... $2,500 $0 Jun 27, 2022
May 27, 2021 35575577J ACTIVE CLASS - 1 PERMIT HOLDER FAILED TO ENSURE WORKERS RECEIVE SITE SAFETY ORIENTATION. NOTE-AT THE TIME OF INSPECTION RESPONDING TO ... $2,500 $2,500 Mar 28, 2022
May 27, 2021 35575579N ACTIVE CLASS - 1 BC3301.13.1-SITE SAFETY PLAN NOTE AT THE TIME OF MY INSPECTION FO A 2 STORY DMEO SITE RESPONDING TO A COMPLAINT OF WO... $2,500 $2,500 Mar 28, 2022
May 27, 2021 35575593J ACTIVE CLASS - 1 BC 3301.1.2 FIRE CODE NOTE:AT THE TIME OF INSPECTION OF A 2 STORY DEMOSITE IN PROGRESS UPON INSPECTION I OBSERVED GAS... $2,500 $2,500 Mar 28, 2022
May 27, 2021 35575575X RESOLVE CLASS - 1 FAILURE TO INSTITUTE AND MAINTAIN ADEQUATE SAFETY MEASURES NOTE AT THE TIME OF MY INSPECTION RESPONDING TO A COMPLAIN... $0 $0 Oct 24, 2022
May 27, 2021 35575580K RESOLVE CLASS - 1 FAILURE TO PROMPTLY NOTIFY THE DEPARTMENT OF AN ACCIDENT THAT OCCURED ON A CONSTRUCTION SITE NOTE AT THE TIME OF MY I... $0 $0 Oct 24, 2022
May 27, 2021 35575586L ACTIVE CLASS - 1 BC3303.7.3.1-TEMPORARY LIGHTING FOR CONSTRYCTION SITES NOTE AT THE TIME OF MY INSPECTION OF A 2 STORY DEMO SITE I OBS... $1,250 $1,250 Feb 4, 2022
May 27, 2021 35575587N ACTIVE CLASS - 1 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS NOTE AT THE TIME OF MY INSPECTION OF A 2 STORY DEM... $2,500 $2,500 Feb 4, 2022
May 27, 2021 35575588P ACTIVE CLASS - 1 BC3301.6-DESIGN ,SIZES AND CAPACITY OF MATERIALS STRUCTURES TEMPRARY CONSTRUCTION AND EQUIPMENT NOTE AT THE TIME OF M... $2,500 $2,500 Feb 4, 2022
May 27, 2021 35575589R ACTIVE CLASS - 2 STORAGE ON THE TOP OF SIDEWLAK SHED NOTE AT THE TIME OF MY INSPECTION OF A 2 STORY DEMO SITE I OBSERVED AS WALKING TH... $1,250 $1,250 Feb 4, 2022
May 27, 2021 35575590Y ACTIVE CLASS - 1 BC 3315.2 PLATFORMS NOTE:AT THE TIME OF INSPECTION I OBSERVED PLATFORMOVER LARGE OPENING IN FLOOR ON THE SECOND FLOOR... $2,500 $2,500 Feb 4, 2022
May 27, 2021 35575591X ACTIVE CLASS - 1 FAILURE TO ENSURE EACH WORKER IS IN COMPLIANCE WITH BC 33212.1 NOTE:ATTHE TIME OF INSPECTION OF A 2 STORY DEMO SITE I... $5,000 $5,000 Feb 4, 2022
May 27, 2021 35575592H ACTIVE CLASS - 1 FAILURE TO MAINTAIN/DISPLAY ONSITE DOCUMENTS REQUIRED BY BC CHAPTER 33NOTE:AT THE TIME OF INSPECTION OF A 2 STORY DEM... $2,500 $2,500 Feb 4, 2022
May 27, 2021 35662175M ACTIVE CLASS - 1 FAILURE TO INSTITUTE AND MAINTAIN ADEQUATE SAFETY MEASURES.NOTE-AT THETIME OF INSPECTION RESPONDING TO A COMPLAINT 37... $25,000 $25,000 Mar 22, 2023
May 27, 2021 35575581M ACTIVE CLASS - 1 BC3314.1-UNSAFE SUPPORTED PIPE SCAFFOLD NOTE AT THE TIME OF MY INSPECTION I OBSERVED AS I WALKED THE SUPPORTED PIPE S... $2,500 $2,500 Aug 22, 2022
May 27, 2021 35575583X ACTIVE CLASS - 1 FAILURE TO INSTITUTE AND MAINTAIN SAFETY EQUIPMENT MEASURES AND TEMPORARY CONSTRUCTION NO GUARD RAILS NOTE AT THE TIM... $5,000 $5,000 Aug 22, 2022
May 27, 2021 35662176Y ACTIVE CLASS - 1 FAILURE TO INSTITUTE AND MAINTAIN ADEQUATE SAFETY MEASURES.NOTE AT THETIME OF INSPECTION RESPONDING TO COMPLAINT#3798... $25,000 $25,000 Apr 5, 2023
May 27, 2021 35575596P ACTIVE CLASS - 1 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES AS PER RULE.THE FOLLOWING HAZARDOUS AND UNSAFE CONDITIONS WAS OB... $10,000 $0 Sep 19, 2022
May 27, 2021 35575578L ACTIVE CLASS - 1 FAILURE TO COMMUNICATE REQURIED INFORMATION TO WORKERS DURING PRE SHIFT SAFETY MEETING NOTE AT THE TIME OF MY INSPECT... $2,500 $2,500 Oct 24, 2022
May 27, 2021 35575584H ACTIVE CLASS - 1 BC3301.1.1.2-FIRE CODE NOTE AT THE TIME OF MY INSPECTION OF A 2 STORY DEMO SITE IN PROGRESS I OBSERVED INADEQUATE STO... $2,500 $2,500 Aug 22, 2022