Maintenance code violations
399-421 East 17 Street, Brooklyn • Block 05160 • Lot 0048
367 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Jun 4, 2013 | A | VIOLATION CLOSED | SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING IN THE BATHR... | 5D | Sep 7, 2013 |
| Apr 29, 2013 | B | VIOLATION CLOSED | SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE 2nd BATHROOM FROM EAST LOCATED... | 5D | Jun 3, 2013 |
| Apr 26, 2013 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE 1st ... | 5D | May 31, 2013 |
| Apr 26, 2013 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE... | 5D | May 31, 2013 |
| Apr 26, 2013 | B | VIOLATION CLOSED | SECTION 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... | 5D | May 31, 2013 |
| Apr 26, 2013 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR FRAME IN THE 2nd ROOM FROM NORTH AT WEST LOCATE... | 5D | May 31, 2013 |
| Apr 26, 2013 | A | VIOLATION CLOSED | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 1st BAT... | 5D | Jul 30, 2013 |
| Apr 11, 2013 | B | VIOLATION CLOSED | SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT F... | 5D | May 16, 2013 |
| Apr 11, 2013 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE DRAIN COVER ON PAVEMENT IN COURTYARD AT FRONT OF BUILDING | — | Apr 17, 2013 |
| Apr 11, 2013 | B | VIOLATION CLOSED | SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 5D, 5th ST... | 5D | May 16, 2013 |
| Apr 1, 2013 | A | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 1st... | 5D | Jul 5, 2013 |
| Apr 1, 2013 | B | VIOLATION DISMISSED | SECTION 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE CONNECTION ON THE FLUSHOMETER AT THE WATER CLOSET IN THE 1st... | 5D | May 6, 2013 |
| Apr 1, 2013 | A | VIOLATION CLOSED | SECTION 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... | 5D | Jul 5, 2013 |
| Feb 5, 2013 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING I... | 2A | Mar 12, 2013 |
| Feb 5, 2013 | B | VIOLATION CLOSED | SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 2A, 2nd STORY, APARTMENT AT SO... | 2A | Mar 12, 2013 |
| Feb 5, 2013 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING DEVICE AT DOOR IN THE BATHROOM FROM NORTH AT... | 5D | Mar 12, 2013 |
| Feb 5, 2013 | B | VIOLATION CLOSED | SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHRO... | 5D | Mar 12, 2013 |
| Feb 5, 2013 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING I... | 5D | Mar 12, 2013 |
| Feb 5, 2013 | B | VIOLATION CLOSED | SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACC... | 5D | Mar 12, 2013 |
| Feb 5, 2013 | B | VIOLATION CLOSED | SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FRO... | 5D | Mar 12, 2013 |
| Feb 5, 2013 | B | VIOLATION DISMISSED | SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st RO... | 2L | Mar 12, 2013 |
| Feb 5, 2013 | B | VIOLATION DISMISSED | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING I... | 2L | Mar 12, 2013 |
| Feb 5, 2013 | B | VIOLATION DISMISSED | SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE MOLDING AROUND THE WINDOW IN THE KITCHEN LOCATED AT... | 2L | Mar 12, 2013 |
| Feb 5, 2013 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING I... | 2A | Mar 12, 2013 |
| Feb 5, 2013 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING I... | 2A | Mar 12, 2013 |
| Feb 4, 2013 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN... | 2A | Mar 11, 2013 |
| Feb 4, 2013 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN... | 2A | Mar 11, 2013 |
| Feb 4, 2013 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN... | 2A | Mar 11, 2013 |
| Jan 14, 2013 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LATCH AT LOWER WINDOW SASH IN THE 4th ROOM FROM NORT... | 1A | Feb 18, 2013 |
| Dec 18, 2012 | A | VIOLATION CLOSED | SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... FLOOR IN SHOWER STALL I... | 5D | Mar 23, 2013 |
| Dec 18, 2012 | A | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY SECURE THE LOOSE SINK IN THE KITCHEN LOCATED AT APT 5D | 5D | Mar 23, 2013 |
| Dec 18, 2012 | A | VIOLATION CLOSED | SECTION 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... | 5D | Mar 23, 2013 |
| Dec 18, 2012 | A | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REFIT DOORS IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY | 5D | Mar 23, 2013 |
| Dec 18, 2012 | A | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLOOR IN WATER CLOSET IN THE B... | 5D | Mar 23, 2013 |
| Nov 13, 2012 | A | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE KNOB AT DOOR AT EAST WALL IN THE 2nd ROOM FROM NORTH... | 5D | Feb 16, 2013 |
| Nov 13, 2012 | A | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE SINK IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 3... | 5D | Feb 16, 2013 |
| Nov 13, 2012 | A | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD BASE CABINETS AT WEST WALL IN THE KITCHEN LOCAT... | 5D | Feb 16, 2013 |
| Nov 13, 2012 | A | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUTING CERAMIC TILE AROUND B... | 5D | Feb 16, 2013 |
| Nov 13, 2012 | A | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE 1st ... | 5D | Feb 16, 2013 |
| Nov 13, 2012 | A | VIOLATION CLOSED | SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE 2nd BATHROOM FROM NORTH AT EA... | 5D | Feb 16, 2013 |
| Jul 17, 2012 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SPLICER PLATE DOOR JAMB ENTRANCE IN THE 1st ROOM FROM NORTH AT ... | 5D | Aug 21, 2012 |
| Jul 9, 2012 | A | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REFIT SINK BASE CABINET DOORS IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FRO... | 5D | Oct 12, 2012 |
| Jul 9, 2012 | B | VIOLATION CLOSED | SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th ... | 5D | Aug 13, 2012 |
| Jul 9, 2012 | A | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR KNOB IN THE 1st ROOM FROM NORTH AT WEST LOCATED... | 5D | Oct 12, 2012 |
| Jul 9, 2012 | A | VIOLATION CLOSED | SECTION 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION ... IN THE BATHROOM LOCATED AT APT 5D, 5th S... | 5D | Oct 12, 2012 |
| Apr 2, 2012 | A | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN... | 5D | Jul 6, 2012 |
| Apr 2, 2012 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE 2nd ... | 5D | May 7, 2012 |
| Feb 8, 2012 | A | VIOLATION CLOSED | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE BATHROO... | 3D | May 13, 2012 |
| Feb 8, 2012 | A | VIOLATION CLOSED | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WINDOW FRAME IN THE KI... | 3D | May 13, 2012 |
| Jan 25, 2012 | C | VIOLATION CLOSED | SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK AT DOOR IN THE ENTRANCE... | 4A | Jan 31, 2012 |