2801 Bedford Avenue, Brooklyn • Block 05246 • Lot 0020
13 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jul 9, 2003 | 34407765H | RESOLVE | Non-Hazardous | FAILURE TO MAINTAIN DEFECT IS LEADERS ON NORTH SIDE AND SOUTH STREET SIDE OF PREMISES ARE NOT CONNECTED TO STORM ALLO... | $0 | $0 | Aug 25, 2003 |
| Jun 25, 2003 | 32042054J | RESOLVE | Non-Hazardous | 4A,19B,B4B,PIPE BANK FLOW PRVENTOR DOWN NO THRENDED END. | $400 | $0 | Sep 15, 2003 |
| Mar 26, 2003 | 34392378Z | RESOLVE | Hazardous | PLUMBING WORK WITHOUT A PERMIT. DEMOLITON, ALTERATION AND OR NEW INSTALLATION OF A NEW LOW PRESSURE HOT WATER BOILER ... | $800 | $0 | Aug 12, 2003 |
| Mar 25, 2003 | 34387158K | RESOLVE | Non-Hazardous | FAILURE TO COMPLY WITH THE REQUIRED VENTILLATING SYSTEMS PROCEDURE FOR AN EXTERIOR 6' PLASTIC PIPE PATRUDING APPRONIM... | $0 | $0 | Aug 12, 2003 |
| Mar 25, 2003 | 34387159M | RESOLVE | Non-Hazardous | WORK WITHOUT PERMITS. WORK NOTED: AT NORTH SIDE OF BLDG EXIST AN EXHOUST INTAKE PLASTIC (PVC) PIPE PARTUDING APPROXIM... | $500 | $0 | Aug 12, 2003 |
| Mar 10, 2003 | 34368644M | RESOLVE | Hazardous | PLUMBING WORK PERFORMED WAS REQUIRED TO BE PERFORMED BY A LICENSED MATER PLUMBER DEMOLITION, ALTERATION AND / OR INST... | $400 | $0 | Jun 9, 2003 |
| Mar 10, 2003 | 34368645Y | RESOLVE | Non-Hazardous | USE OR INSTALLATION OF PLUMBING MATERIALS WHICH DO NOT COMPLY WITH RS-16 USE OF 2 - 2" FENCED COUPLING ON PVC PIPING ... | $0 | $0 | Jun 9, 2003 |
| Mar 10, 2003 | 34368643K | RESOLVE | Hazardous | PLUMBING WORK W/O A PERMIT DEMOLITION, ALTERATION AND / OR NEW INSTALLATION OF A NEW LOW PRESSURE HOT WATER BOILER WI... | $800 | $0 | Jun 9, 2003 |
| Mar 10, 2003 | 34368642Z | RESOLVE | Non-Hazardous | FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED ! 1) NE HOT WATER BOILER AND TANK 2) 40" OF 3/4" GAS PIPING 3) ... | $400 | $0 | Jun 9, 2003 |
| Jan 9, 2003 | 32040947H | RESOLVE | Hazardous | 4A-19B. | $0 | $0 | Mar 24, 2003 |
| Nov 26, 2002 | 34341136X | RESOLVE | Non-Hazardous | FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED. 1) NEW HOT WATER BOILER 2) GAS PIPING 3) WATER PIPING 4) VENT ... | $0 | $0 | Feb 3, 2003 |
| Nov 26, 2002 | 34341134M | RESOLVE | Non-Hazardous | PLUMBING WROK W/O A EPRMIT INSTALLATION OF A NEW HOT WATER BOILER AND ALL RELATED GAS, WATER, VENT PIPING N BASEMENT ... | $0 | $0 | Feb 3, 2003 |
| Nov 26, 2002 | 34341135Y | RESOLVE | Hazardous | PLUMBING WORK PERFORMED WAS REUIRED TO BE PERFORMED BY A LICENSED MASTER PLUMBER INSTALLATION OF A NEW HOT WATER BOIL... | $0 | $0 | Feb 3, 2003 |