Skip to content

Job filings

151-169 East 2 Street, Brooklyn • Block 05316 • Lot 0001

15 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Nov 7, 2019 322011675 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK INSTALL WILSCOT TEMPORARY STRUCTURE FOR TEMPORARY USE AS CLASSROOMS $30,000 BKYN PROSPECT CHARTER SCHOOL
Sep 30, 2019 322011666 Alteration Type II PLAN EXAM - PARTIAL APPROVAL INSTALL TEMPORARY CASSONE TRAILERS FOR TEMPORARY USE AS CLASSROOMS AS PER THE PLANS FILED HEREWITH. $10,000 BKYN PROSPECT CHARTER SCHOOL
Aug 28, 2019 321981922 Alteration Type I PERMIT ISSUED - ENTIRE JOB/WORK CONVERT EXISTING RESIDENTIAL SLEEPING ROOMS AND ASSOCIATED KITCHEN AND LAUNDRY AREA INTO OFFICES AND CLASSROOMS ON TH... $325,000 IMMACULATE HEART OF MARY RC CHUR
Aug 23, 2019 340694118 Alteration Type II PLAN EXAM - IN PROCESS CONSTRUCTION OF TEMPORARY CLASSROOM USING MODULAR CONSTRUCTED BUILDING FOR OCCUPANCY. TEMP STRUCTURE TO BE OCUPPIED F... $50,000 BKYN PROSPECT CHARTER SCHOOL
Aug 2, 2019 321930452 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK MISC INTERIOR WORK OF REMOVALS OF NON-LOAD BEARING PARTITIONS, PLUMBING FIXTURES , FINISHES FOR PROBES. NO CHANGE TO ... $80,000 IMMACULATE HEART OF MARY RC CHUR
Mar 31, 2017 321234017 Alteration Type II SIGNED OFF ROOF REPLACEMENT AT MAIN UPPER ROOF , NO CHANGE TO ZONING, USE, OCCUPANCY OR EGRESS $230,000 IMMACULATE HEART MARY RC CHURCH
Aug 26, 2016 340399269 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY... $0 HKS CONSTRUCTION CORP
Jul 21, 2015 320862526 Alteration Type I SIGNED OFF $420,000 IMMACULATE HEART OF MARY CHURCH
Jul 2, 2015 320942708 Alteration Type II SIGNED OFF INSTALLATION OF MANUAL AND AUTOMATIC SMOKE/HEAT/ CO DETECTION FIRE ALARM SYSTEM. $70,200 IMMACULATE HEART OF MARY CHURCH
Jun 18, 2015 321029560 Alteration Type III SIGNED OFF BPCS: FIRE PROTECTION PLAN FILED IN CONJUNCTION WITH ALT 1 # 320-862-526 FOR BROOKLYN PROSPECT CHARTER SCHOOL EXPANSION. $2,000 IMMACULATE HEART OF MARY CHURCH
Mar 23, 2015 321006371 Alteration Type II SIGNED OFF BROOKLYN PROSPECT CHARTER SCHOOL RENOVATIONS WITHIN THE IMMACULATE HEART OF MARY: GENERAL CONSTRUCTION SCOPE MINOR RE... $250,000 IMMACULATE HEART OF MARY CHURCH
Jun 11, 2014 340153292 Alteration Type II PLAN EXAM - IN PROCESS BROOKLYN PROSPECT CHARTER SCHOOL RENOVATIONS WITHIN THE IMMACULATE HEART OF MARY: GENERAL CONSTRUCTION SCOPE MINOR RE... $250,000 IMMACULATE HEART OF MARY CHURCH
Jan 2, 2014 320742461 Alteration Type II SIGNED OFF BPCS: GENERAL CONSTRUCTION NON-LOAD BEARING PARTITIONS ASSOCIATED TO NEW CEILING SUSPENDED OPERABLE PARTITION AT 1ST ... $75,000 IMMACULATE HEART OF MARY CHURCH
Mar 5, 2013 320501845 Alteration Type II SIGNED OFF BROOKLYN PROSPECT CHARTER SCHOOL RENOVATIONS WITHIN THE IMMACULATE HEART OF MARY SCHOOL: GENERAL CONSTRUCTION SCOPE M... $250,000 IMMACULATE HEART OF MARY CHURCH
Jan 17, 2003 301383116 Alteration Type II SIGNED OFF General renovation to facade and roof of existing four-story structure as indicated on drawings. No change in use egr... $500,000 Immaculate Heart of Mary