121-125 Ditmas Avenue, Brooklyn • Block 05385 • Lot 0049

10 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
May 8, 2026 39553909P RESOLVE CLASS - 1 AT TIME OF INSPECTION, OBSERVED FOAM SHAVING IN PROGRESS AT EXP# 3, CAUSING FOAM PARTICLES AND DEBRIS TO BECOME AIRBO... $2,500 $2,500 Feb 12, 2027
Apr 29, 2026 39553618P RESOLVE CLASS - 2 DURING MY INSPECTION AND UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS SSM / SSC ON MULTIPLE PERMITS AND NB NOT IN CO... $2,500 $2,500 Mar 4, 2027
Apr 29, 2026 39553624L RESOLVE CLASS - 2 AT TIME OF INSPECTION OBSERVED PUMP JACK SCAFFOLD INSTALLED AT EXPOSURE# 4 ON TOP OF ADJACENT PROPERTY ROOF WHICH EXC... $1,250 $1,250 Jan 19, 2027
Apr 29, 2026 39553625N ACTIVE CLASS - 2 AT TIME OF INSPECTION OBSERVED SUP. SCAFFOLD INSTALLED ON TOP SWS AND PUMP JACK INSTALLED ON ADJACENT PROPERTY ROOF O... $2,400 $2,400 Jan 19, 2027
Apr 29, 2026 39553622H RESOLVE CLASS - 2 AT TIME OF INSPECTION OBSERVED PUMP JACK SCAFFOLD INSTALLED AT EXPOSURE# 4 ON TOP OF ADJACENT PROPERTY ROOF WHICH EXC... $0 $0 Jul 8, 2026
Mar 18, 2026 39551958M RESOLVE CLASS - 1 NEW MAJOR BUILDING AT 8TH FL LEVEL. PER RECORDS, OPERATIONS BEGAN 08/20/25. I OBSERVED THAT, NO SITE SAFETY MANAGER O... $10,000 $10,000 Jan 12, 2027
Mar 18, 2026 39551943J RESOLVE CLASS - 1 AT TIME OF INSPECTION OF AN ACTIVE JOB SITE FOR A NEW 8-STORY MIXED-USE BUILDING, STRUCTURAL WORK WAS OBSERVED IN PRO... $2,500 $2,500 Jan 12, 2027
Mar 18, 2026 39551944L RESOLVE CLASS - 1 28-110.1 AT TIME OF INSPECTION, OBSERVED THE SITE SAFETY PLAN DOES NOT CONFORM TO THE EXISTING SITE CONDITIONS, AS SU... $2,500 $2,500 Jan 12, 2027
Mar 18, 2026 39551945N RESOLVE CLASS - 1 BC 3307.2.1 ATOI, OBSERVED SIDEWALK EXCAVATED AT EXP#1. ALSO A CONCRETE TRUCK OCCUPYING THE ROADWAY IN FRONT OF BUILD... $5,000 $5,000 Jan 12, 2027
Mar 18, 2026 39551946P RESOLVE CLASS - 1 AT TIME OF INSPECTION OF AN ACTIVE JOB SITE FOR A NEW 8-STORY MIXED-USE BUILDING, OBSERVED NO PROTECTION PROVIDED FOR... $10,000 $10,000 Jan 12, 2027