Mcdonald Avenue, Brooklyn
Brooklyn • Block 05464 • Lot 0043 • Zip: 11230
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 35 min 4 walking, 31 riding
- Fulton Street 41 min 4 walking, 37 riding
- Union Square 44 min 4 walking, 40 riding
- Times Square 49 min 4 walking, 45 riding
- Penn Station 51 min 4 walking, 47 riding
- Grand Central 52 min 4 walking, 48 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2023
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
2022
-
CLASS - 2
FOUND FULTON GAS BOILER NB#95427 ACTIVE WITH DEFECTS. MISSING COMBUSTION AIR DIRECTLY FROM OUTDOORS. CONDENSATE RETUR...
-
CLASS - 2
FOUND FULTON GAS BOILER NB#98814 ACTIVE WITH DEFECTS. MISSING COMBUSTION AIR DIRECTLY FROM OUTDOORS. LOWER EXTERNAL B...
2018
-
DOB violation Jun 22, 2018
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
-
DOB violation Jun 22, 2018
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
2017
-
DOB violation Jun 23, 2017
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
-
DOB violation Jun 23, 2017
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
2006
-
Alteration Type II
INSTALL DRY CLEANING STORE (U.G.6) PER PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.
2005
-
Alteration Type II
INSTALL DRY CLEANING MACHINE IN EXISTING DRY CLEANING STORE. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICA...
-
Alteration Type II
INSTALL ADDITIONAL BOILER & BOILER ENCLOSURE IN CELLAR NO CHANGE IN USE OCCUPANCY OR EGRESS
2004
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records