4930 20 Avenue, Brooklyn
Brooklyn • Block 05464 • Lot 0081 • Zip: 11204
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Downtown Brooklyn 35 min 4 walking, 31 riding
- Fulton Street 41 min 4 walking, 37 riding
- Union Square 44 min 4 walking, 40 riding
- Times Square 49 min 4 walking, 45 riding
- Penn Station 51 min 4 walking, 47 riding
- Grand Central 52 min 4 walking, 48 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Ferry
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
2024
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
2023
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
2022
2021
-
Alteration Type I
ALTERATION TYPE 1. NEW CERTIFICATE OF OCCUPANCY FOR PROPOSED PHYSICAL, CULT URAL ESTABLISHMENT. (PCE) NEW INTERIOR ME...
2020
-
CLASS - 2
OPERATION OF A PLACE OF ASSEMBLY W/OUT A FR PERMIT FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/...
-
Alteration Type II
ALTERATION TYPE II. INSTALLATION OF NEW BOILER IN CONJUNCTION WITH APPLICATION # 320747509.
-
Alteration Type II
ALTERATION TYPE II. INSTALLATION OF NEW BOILER IN CONJUNCTION WITH APPLICATION # 320747509
-
Alteration Type II
ALTERATION TYPE II. INTERIOR RENOVATION OF EXISTING MANUFACTURING BUILDING. NEW PLUMBING WORK. NO INCREASE IN BULK OR...
-
Place of Assembly
-
CLASS - 1
OBSERVED 5-7 PEOPLE WORKING/WORKING OUT IN GYM ON FIRST (1) FLOOR ALSO WEIGHT MACHINES, BOXING RING & TREAD MILLS, FI...
-
CLASS - 2
ECB VIOLATION ISSUED 10-04-18 FOR ALTERED BUILDING OCCUPIED WITHOUT A CERTIFICATE OF OCCUPANCY, AT THE TIME OF INSPEC...
2019
-
CLASS - 2
FAILURE TO COMPLY W/COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DOB'S. FAILURE TO COMPLY W/THE COMM'S ORDER TO FI...
2018
-
CLASS - 2
ALTERED/CHANGED BLDG OCCUPIED W/O A VALID CERT OF OCCUPANCY AS PER 28-118.3.1 & 28-118.3.2. OBSERVED: THE FITNESS CLU...
-
CLASS - 1
ON 09-24-18 @ 3:00 PM I OBSERVED ON THE 1ST FLOOR AN ACTIVE FITNESS CLUB BUSINESS BEING OCCUPIED WITHOUT AN AUTOMATIC...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records