Skip to content

DOB violations

1013 42 Street, Brooklyn • Block 05591 • Lot 0002

17 records

Violations issued by the Department of Buildings.

Issued Violation Type Category Description Disposed
Sep 23, 2024 01350 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION Dec 2, 2024
Sep 23, 2024 00473 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION Dec 2, 2024
Jul 25, 2023 17762 IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL V*-DOB VIOLATION - DISMISSED ERECT 80'FT OF SIDEWALK SHED ALONG EXPOSURE#1 (NEW UTRECT AVENUE) AND APRROXIMATELY 30 FT AT EXPOSURE#4 (42 STREET ) ... Nov 30, 2023
Jul 25, 2023 23-02132 C-CONSTRUCTION OTHER OPTIONAL V*-DOB VIOLATION - DISMISSED OBSERVED FACADE IN STATE OF DISREPAIR. AT EXP#1 PARAPET WALL HAVE CRACKS AT MULTIPLE LOCATION ONE SIDE PARAPET WALL L... Sep 29, 2023
Jun 30, 2023 04364 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION Dec 2, 2024
Jun 30, 2023 02023 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION Dec 2, 2024
Jun 30, 2023 00865 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION Dec 2, 2024
Jun 30, 2023 03230 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION Dec 2, 2024
Jun 20, 2023 04466 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION Dec 2, 2024
Jun 20, 2023 00913 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION Dec 2, 2024
Jun 20, 2023 02121 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION Dec 2, 2024
Jun 20, 2023 03323 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION Dec 2, 2024
Apr 25, 2023 01758 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION Dec 2, 2024
Apr 25, 2023 00622 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION Dec 2, 2024
Mar 16, 2020 00679 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION Dec 2, 2024
Dec 16, 2016 00191 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION Dec 2, 2024
Mar 3, 2015 00668 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION Dec 2, 2024