DOB violations
1013 42 Street, Brooklyn • Block 05591 • Lot 0002
17 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Sep 23, 2024 | 01350 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION | Dec 2, 2024 |
| Sep 23, 2024 | 00473 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | Dec 2, 2024 |
| Jul 25, 2023 | 17762 | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | V*-DOB VIOLATION - DISMISSED | ERECT 80'FT OF SIDEWALK SHED ALONG EXPOSURE#1 (NEW UTRECT AVENUE) AND APRROXIMATELY 30 FT AT EXPOSURE#4 (42 STREET ) ... | Nov 30, 2023 |
| Jul 25, 2023 | 23-02132 | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | OBSERVED FACADE IN STATE OF DISREPAIR. AT EXP#1 PARAPET WALL HAVE CRACKS AT MULTIPLE LOCATION ONE SIDE PARAPET WALL L... | Sep 29, 2023 |
| Jun 30, 2023 | 04364 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | Dec 2, 2024 |
| Jun 30, 2023 | 02023 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | Dec 2, 2024 |
| Jun 30, 2023 | 00865 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | Dec 2, 2024 |
| Jun 30, 2023 | 03230 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | Dec 2, 2024 |
| Jun 20, 2023 | 04466 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | Dec 2, 2024 |
| Jun 20, 2023 | 00913 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Dec 2, 2024 |
| Jun 20, 2023 | 02121 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Dec 2, 2024 |
| Jun 20, 2023 | 03323 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | Dec 2, 2024 |
| Apr 25, 2023 | 01758 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION | Dec 2, 2024 |
| Apr 25, 2023 | 00622 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION | Dec 2, 2024 |
| Mar 16, 2020 | 00679 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Dec 2, 2024 |
| Dec 16, 2016 | 00191 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION | Dec 2, 2024 |
| Mar 3, 2015 | 00668 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION | Dec 2, 2024 |