Maintenance code violations
1301-1309 44 Street, Brooklyn • Block 05605 • Lot 0001
22 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| May 1, 2026 | A | NOV SENT OUT | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Aug 4, 2026 |
| Jun 5, 2025 | A | NOV SENT OUT | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Sep 8, 2025 |
| Apr 3, 2024 | A | NOV SENT OUT | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Jul 7, 2024 |
| — | I | VIOLATION DISMISSED | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27... | — | — |
| Feb 18, 2022 | A | NOV SENT OUT | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | May 24, 2022 |
| Apr 5, 2021 | A | NOV SENT OUT | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Jul 9, 2021 |
| Aug 27, 2010 | A | NOV SENT OUT | SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT SOUTH SIDE OF THE BUILDING AT FIRE ESCAPE | — | Nov 30, 2010 |
| Aug 13, 2010 | B | NOV CERTIFIED LATE | SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERATIVE LOCATED AT APT 4R, 3rd ... | 4R | Sep 17, 2010 |
| Aug 13, 2010 | B | NOV CERTIFIED LATE | SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR INOPERATIVE LOCATED AT APT 4R, 3rd STORY, APARTMENT AT ... | 4R | Sep 17, 2010 |
| Aug 7, 2009 | C | NOV SENT OUT | SECTION 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 4R, 4th S... | 4R | Aug 13, 2009 |
| Jun 26, 2009 | B | NOT COMPLIED WITH | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE BATHROOM LOCATED AT APT 4R, 3rd ST... | 4R | Jul 31, 2009 |
| Jun 18, 2008 | B | NOV SENT OUT | SECTION 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITI... | — | Jul 23, 2008 |
| Jun 18, 2008 | B | NOV SENT OUT | D26-10.01, 10.05 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE... | — | Jul 23, 2008 |
| Jun 18, 2008 | B | NOV SENT OUT | D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CLG 2 STY E... | 2R | Jul 23, 2008 |
| Jun 18, 2008 | B | NOV SENT OUT | D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CLG 2 STY EAST APT ... | 2R | Jul 23, 2008 |
| Jun 18, 2008 | B | NOV SENT OUT | D26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL CLG BOILER ROOM CELAR NORTHEAST. | — | Jul 23, 2008 |
| Jun 18, 2008 | B | NOV SENT OUT | D26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PLASTERBOARD CLG CELLAR THRUOUT. | — | Jul 23, 2008 |
| Jun 18, 2008 | B | NOV SENT OUT | SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOSED ELECTRICAL WIRES CEILING CELLAR THRU ... | — | Jul 23, 2008 |
| Jun 18, 2008 | B | NOV SENT OUT | SECTION 27-2040 ADM CODE INSTALL AND MAINTAIN SUFFICIENT LIGHT OR LIGHTS OF AT LEAST 100 WATTS INCANDESCENT OR EQUIVA... | — | Jul 23, 2008 |
| Jun 18, 2008 | B | NOV SENT OUT | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES 2 STY EAST... | 2R | Jul 23, 2008 |
| Jun 18, 2008 | B | NOV SENT OUT | SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING BALUSTER 1 TO 2 STY PUBLIC HALL. | — | Jul 23, 2008 |
| Jun 18, 2008 | B | NOV SENT OUT | SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AN... | — | Jul 23, 2008 |