ECB violations
4512 Fort Hamilton Parkway, Brooklyn • Block 05614 • Lot 0028
7 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jul 29, 2008 | 32060039K | ACTIVE | CLASS - 2 | 50A.50B.50C.50D 50A FLUE PIPE NOT PROPERLY INSERTED INTO CHIMNEY BASE 50B INSTALL STRUCTURAL SUPPORT THREADED ROD & C... | $250 | $0 | Nov 20, 2008 |
| Jun 27, 2006 | 32051778J | RESOLVE | Non-Hazardous | B4A,48A,48B,50A,18A,18B/50A-REPAIR FIRE STOPPING ON CEILING ABOVE BOILER/50B-CLEAN BASEMENT OF ALL DEBRIS/50C-SEAL CH... | $180 | $0 | Mar 20, 2008 |
| Dec 6, 2004 | 32046438R | RESOLVE | Non-Hazardous | 19B/50 BQ9/36 50-SAFELY VALVE IS NOT INSTALLED VERTICAL WITH THE SPINDLE ON TOP- DISCHARGE PIPE HAS A THREADED END. B... | $180 | $0 | Jan 24, 2005 |
| Aug 13, 2003 | 32042888X | RESOLVE | Non-Hazardous | 18A,50A,50B,50C,50D,48AB FULTON YERT TBLS BOILER NB76848 10HP GAS FIRED 1996 50A SAFETY VALVE DISCHARGE PIPE TOO SHOR... | $0 | $0 | Sep 29, 2003 |
| Oct 30, 2000 | 32021007Y | RESOLVE | Non-Hazardous | 49,48A,48B.FLUE PIPE SECTION CRACKED AND CORRODED.WATER COLUMN DRAIN REDUCED.BLOWDOWN NIPPLE BETWEEN 1 + 2VALVE CORRO... | $0 | $0 | Dec 18, 2000 |
| Jan 18, 2000 | 32017816M | RESOLVE | Non-Hazardous | 48A,48B,49 SAFETY VALVE OPENS PREMATURLY TO BE REPLACED BY NEW ONE | $0 | $0 | Mar 6, 2000 |
| Apr 25, 1996 | 32013970M | ACTIVE | Non-Hazardous | 44C,49.1-WATER COLUMN AND BLOWDOWN LINES HAVE BEEN REDUCED THEY MUST BE THE SAME SIZE AS THE BOILER OPENING THROUGHOU... | $350 | $0 | Jul 22, 1996 |