Skip to content

DOB violations

4512 Fort Hamilton Parkway, Brooklyn • Block 05614 • Lot 0028

7 records

Violations issued by the Department of Buildings.

Issued Violation Type Category Description Disposed
Nov 14, 2025 00452 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 01273 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 04534 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 02306 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Mar 16, 2020 00852 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
Jun 22, 2018 00290 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
Feb 13, 2004 21066 LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED V-DOB VIOLATION - ACTIVE