ECB violations

1160 47 Street, Brooklyn • Block 05627 • Lot 0053

14 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Jan 9, 2026 39549015Y ACTIVE CLASS - 2 OBSERVED THAT NO CONSTRUCTION FENCE WAS INSTALLED ALONG EXP 1 OF THE SITE, AS REQUIRED TO SAFEGUARD THE PUBLIC AND SE... $1,000 $1,000 Oct 13, 2026
Jan 9, 2026 39549025H ACTIVE CLASS - 2 AT TIME OF INSPECTION NO OVERHEAD PROTECTION WAS PROVIDED FOR THE ADJOINING PROPERTY @ THE CORNER OF EXP 2 & 3. OBSER... $5,000 $5,000 Oct 13, 2026
Jan 9, 2026 39549039Z ACTIVE CLASS - 2 OBSERVED THAT THE CONSTRUCTION SHANTY ON THE BASEMENT OF THE SITE WAS NOT CONSTRUCTED OF FIRE RATED MATERIALS AS REQU... $1,250 $1,250 Oct 13, 2026
Jan 9, 2026 39549013K ACTIVE CLASS - 2 AT TIME OF INSPECTION REQUESTED CONSTRUCTION SUPER LOGS WERE NOT MAINTAIN ON SITE AS REQUIRED. ALSO CS FAILED TO APPO... $5,000 $5,000 Oct 13, 2026
Jan 9, 2026 39549038R ACTIVE CLASS - 2 AT TIME OF INSPECTION, IT WAS OBSERVED THAT THE CONSTRUCTION SITE FAILED TO HAVE REQUIRED DESIGN DRAWINGS FOR THE INS... $1,250 $1,250 Oct 13, 2026
Jan 9, 2026 39549020Z ACTIVE CLASS - 1 IT WAS OBSERVED THAT THE CONSTRUCTION SITE FAILED TO HAVE A REQUIRED SITE SAFETY PLAN AND NO DAILY LOGS ON SITE AVAIL... $2,500 $2,500 Oct 13, 2026
Jan 9, 2026 39549022M ACTIVE CLASS - 1 AT THE TIME OF INSPECTION, IT WAS OBSERVED THAT THE CONSTRUCTION SITE FAILED TO PROVIDE A REQUIRED SIDEWALK SHED ALON... $4,800 $4,800 Oct 13, 2026
Nov 25, 2025 39547333K ACTIVE CLASS - 1 3314.4.4.12 EXPOSED ELECTRICAL WIRE AT EXPOSER #1.STOP ALL WORK AT EXPOSER #1 SIDE WALK SHED $10,000 $10,000 Feb 5, 2027
Nov 25, 2025 39547330P ACTIVE CLASS - 1 BC 3314.1 AT THE TIME OF MY INSPECTION OF A 3-STORY BUILDING, I OBSERVED PIPE SCAFFOLD AT EXP# 1 NOT MAINTAINED, WITH... $10,000 $10,000 Feb 4, 2027
Nov 25, 2025 39547331R ACTIVE CLASS - 2 BC3307.2.1 AT THE TIME OF MY INSPECTION OF A 3-STORY BUILDING, I OBSERVED MATERIAL STORED ON THE SIDEWALK, BLOCKING A... $10,000 $10,000 Feb 4, 2027
Nov 25, 2025 39547334M ACTIVE CLASS - 1 WORK CONTRARY TO PIPE SCAFFOLD PLANS. STOP ALL WORK ON SUPPORTED PIPE SCAFFOLDING AT EXPOSER #1 $12,500 $12,500 Feb 5, 2027
Jun 26, 2025 39541713P ACTIVE CLASS - 2 AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING UNDER ALTERATION , I OBSERVED THERE WERE NO OVERHEAD PROTECTION PR... $5,000 $5,000 Oct 16, 2026
Jun 26, 2025 39541712N ACTIVE CLASS - 2 BC 3309.11 AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING UNDER ALTERATION , I OBSERVED THERE WERE NO TREE PROTEC... $10,000 $10,000 Mar 4, 2027
Aug 12, 2023 39520493J RESOLVE CLASS - 2 AT TIME OF INSPECTION, I OBSERVED CONTAINER ON STREETS AT EXPOSURE #1 FILLED AND NOT COVERED./ COVER CONTAINER. $3,125 $3,125 Sep 23, 2024