1348 49 Street, Brooklyn
Brooklyn • Block 05642 • Lot 0027 • Zip: 11219
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 35 min 4 walking, 31 riding
- Fulton Street 41 min 4 walking, 37 riding
- Union Square 44 min 4 walking, 40 riding
- Times Square 49 min 4 walking, 45 riding
- Penn Station 51 min 4 walking, 47 riding
- Grand Central 52 min 4 walking, 48 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Ferry
Bus
Places nearby
Milk Crate Coffee
Milk Crate Coffee is a cozy cafe in Brooklyn offering a variety of specialty coffee drinks and pastries. With a relax...
1982 Coffee Roasters
1982 Coffee Roasters is a cozy cafe in Brooklyn offering a variety of specialty coffee blends and pastries. With a wa...
D & D Coffee Shop
Snug, unpretentious standby offering hearty American breakfast & lunch diner staples.
Kaff Kafe
Straightforward counter-serve restaurant offering classic breakfast dishes, plus pizza & sandwiches.
Moti's
Kosher restaurant
Noribar
Sushi restaurant
Sushi Meshuna - Borough Park
Counter-service place offering a range of kosher sushi rolls & sashimi for takeout & delivery.
Benny's Famous Pizza
Benny's Famous Pizza in Brooklyn offers delicious, traditional New York-style pizza with fresh ingredients and a vari...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2019
-
DOB violation Nov 8, 2019
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
-
DOB violation Nov 8, 2019
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2018
-
DOB violation Apr 6, 2018
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
-
DOB violation Apr 6, 2018
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2014
-
New Building
-
Alteration Type II
PROPOSED PLUMBING, BOILER AND MECHANICAL WORK IN CONJUNCTION WITH NB APPLICATION
2013
-
Alteration Type II
INSTALLATION OF INDIVIDUALLY CODED IFA/SMOKE & HEAT DETECTION/SPRINKLER ALARM/COC IN CONJUNCTION WITH NB WITH NB ...
-
DOB violation Aug 24, 2013
E-ELEVATOR ELEVATORREQUIRED
-
Alteration Type II
INSTALLATION OF SPRINKLER SYSTEM INCONJUNCTION WITH NEW BUILDING APPLICATION
-
Alteration Type II
Underpinning herewith filed in conjuction with NB
2012
-
DOB violation Sep 11, 2012
E-ELEVATOR ELEVATORREQUIRED
2011
2009
2006
-
Hazardous
FAILURE TO PROVIDE SHEETING AND SHORING FOR EXCAVATION FOR MORE THAN 5FEET IN DEPTH: NOTED: DURING UNDERPINNING OF AD...
-
Hazardous
WORK CONTRARY TO APPROVED PLANS. NOTED: UNDER PINNING NOT PERFORMED ASPER APPROVED PLANS IN THAT (2) TWO UNDERPINNING...
2005
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records