DOB violations
5605 13 Avenue, Brooklyn • Block 05691 • Lot 0008
8 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Nov 14, 2025 | 00456 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 02205 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 03380 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 01891 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION | — |
| May 15, 2014 | 00192 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION | — |
| May 15, 2014 | 15717 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | — |
| Apr 13, 2009 | EX1209RBO | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION CONTRACTOR FOILED TO PROVIDE SOLKIER PILES AND LAGGING AS REQUIR... | Apr 9, 2012 |
| Jan 2, 2009 | 1201RM | C-CONSTRUCTION OTHER OPTIONAL | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | — | Apr 3, 2012 |