1051-1053 60 Street, Brooklyn
Brooklyn • Block 05709 • Lot 0056 • Zip: 11219
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 6 days ago- Downtown Brooklyn 35 min 4 walking, 31 riding
- Fulton Street 41 min 4 walking, 37 riding
- Union Square 44 min 4 walking, 40 riding
- Times Square 49 min 4 walking, 45 riding
- Penn Station 51 min 4 walking, 47 riding
- Grand Central 52 min 4 walking, 48 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Ferry
Bus
Places nearby
Affable Eatery
No description yet
Dragon Bay Bakery
No description yet
Xi Yue Hui Seafood Hot Pot
No description yet
Rakuzen AYCE Sushi
No description yet
Xiang Hotpot-Brooklyn丨海鲜自助火锅餐厅丨All You Can Eat Restaurant
Chinese hot pot soups with an array of traditional ingredients are the draw at this informal eatery.
New Belacan
No description yet
Yumi Delicacies
No description yet
Bamboo Garden Restaurant
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
2023
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
2009
2008
-
CLASS - 2
18B.48B.50A.50B. 50A INSTALL SECONDARY SLOW OPENING VALVE ON BLOW DOWN LINE TO TERMINATE LAST 50B REMOVE COMBUSTIBLE ...
2006
-
Alteration Type II
REPLACE NEW PLUMBING FIXTURES AND MINOR PARTITIONS IN 1ST FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCT.
2005
-
Non-Hazardous
48B/50A/50B/50C/50D/50E/50F/-1972 FULTON NBD 26289. 50A-REMOVE DEBRIS FROM BOILER AREA.50B-CHIMNEY NEED TO BE 3' TALL...
2002
-
Non-Hazardous
FAILURE TO PROVIDE PANIC HARDWARE IN THAT DEAD BOLT LOCK INSTALLED ON ENTRANCE DOOR TO SOWING FACTORY BUSINESS. REMED...
1991
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records