1077-1083 61 Street, Brooklyn
Brooklyn • Block 05716 • Lot 0043 • Zip: 11219
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 35 min 4 walking, 31 riding
- Fulton Street 41 min 4 walking, 37 riding
- Union Square 44 min 4 walking, 40 riding
- Times Square 49 min 4 walking, 45 riding
- Penn Station 51 min 4 walking, 47 riding
- Grand Central 52 min 4 walking, 48 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Ferry
Bus
Places nearby
Dragon Bay Bakery
No description yet
Xi Yue Hui Seafood Hot Pot
No description yet
Rakuzen AYCE Sushi
No description yet
Wei Mei Xian
No description yet
Affable Eatery
No description yet
The Nightingale Restaurant and Lounge
The Nightingale Restaurant and Lounge in Brooklyn offers a cozy and intimate atmosphere perfect for a night out with ...
Xiang Hotpot-Brooklyn丨海鲜自助火锅餐厅丨All You Can Eat Restaurant
Chinese hot pot soups with an array of traditional ingredients are the draw at this informal eatery.
1982 Coffee Roasters
1982 Coffee Roasters is a cozy cafe in Brooklyn offering a variety of specialty coffee blends and pastries. With a wa...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jul 10, 2025
P-PLUMBING NONE
BASED ON LMP# 1343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB# 340438832
2024
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
2023
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
2022
2018
2017
-
Alteration Type II
INSTALLATION OF NEW INTERIOR PARTITIONS, NEW CEILINGS AND FINISHES , PLUMING AND MECHANICAL AS PER PLAN. NO CHANG TO ...
2016
-
Alteration Type II
MODIFICATION OF EXISTING SPRINKLER HEADS ON FIRST FLOOR IN CONJUNCTION TO ALTERATION 2 #340438832.
-
Alteration Type II
INSTALLATION OF NEW INTERIOR PARTITIONS, NEW CEILINGS AND FINISHES. NO CHANG TO USE, EGRESS OR OCCUPANCY.
-
Alteration Type II
FILING FOR EQUIPMENT USE CARDS FOR EXISTING UNITS. NO CHANGE TO USE EGRESS OR OCCUPANCY
2009
-
Alteration Type II
FILING FOR EQUIPMENT USE CARD FOR MECHANICAL EQUIPMENT ON ROOF AND YARD
-
Alteration Type II
Remove existing interior partitions and plumbing fixtures. Cap abandoned utility lines and replace windows & door...
2005
-
Non-Hazardous
18A/18B/32B/34B/50A/50B/50C/-1992 FULTON 66038-50A-NO REMOTE SWITCH OUTSIDE OF BOILER RM. 50B-HOLE IN DOOR.50C-ADD A ...
1998
-
Non-Hazardous
39H,52H,60M,75U,57O, 39-REGROOVE MACHINE SHEAVE 52-RELINE BRAKE 60-REPLACE SPRING BUFFER IN PIT 75-PERFORM 5 YEAR TES...
1990
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records