Job filings
1101-1113 63 Street, Brooklyn • Block 05731 • Lot 0002
17 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Jun 4, 2018 | 302312487 | New Building | SIGNED OFF | — | $0 | COPTIC ORTHODOX CHURCH OF ST GEO |
| May 9, 2018 | 321443354 | Alteration Type II | SIGNED OFF | INSTALLATION OF MANUAL, & AUTOMATIC SMOKE/SPRINKLER ALARM/PRESIGNAL MANUAL W/V OICE FOR STAGE. | $32,000 | COPTIC ORTHODOX CHURCH ST GEORGE |
| Mar 28, 2018 | 321509765 | Alteration Type II | SIGNED OFF | INSTALLATION OF AUTOMATIC SMOKE/HEAT DETECTION FIRE ALARM SYSTEM USING THE EXISTING COMMERICAL FACP. | $10,000 | COPTIC ORTHODOX CHURCH ST GEORGE |
| Apr 11, 2017 | 320845706 | Alteration Type III | SIGNED OFF | BPP APPLICATION FOR 257' OF SIDEWALK NB # 302312487 | $0 | COPTIC ORTHODOX CHURCH OF ST GEO |
| Jun 20, 2016 | 320574008 | Place of Assembly | COMPLETED | — | $0 | COPTIC ORTHODOX CHURCH OF ST.GEO |
| Jun 20, 2016 | 321007236 | Place of Assembly | COMPLETED | — | $0 | COPTIC ORTHODOX CHURCH OF ST.GEO |
| Feb 12, 2016 | 340215760 | Alteration Type II | SIGNED OFF | BOILER APPLICATION FOR (1) COMMERCIAL BOILER "BURNHAM M#V907 1,198,OOO BTU" IN CELLAR, (14)RES BOILERS "BURNHAM M#203... | $30,000 | COPTIC ORTHODOX CHURCH OF ST GEO |
| Jan 28, 2016 | 321010712 | Alteration Type II | SIGNED OFF | INSTALL FIRE SUPPRESSION SYSTEM. NO CHANGE IS USE, EGRESS OR OCCUPANCY. | $3,000 | CHRISTIAN CHURCH |
| Sep 17, 2015 | 320383152 | Alteration Type II | SIGNED OFF | SPRINKLER APPLICATION IN CONJUNCTION WITH NB 302312487 | $150,000 | COPTIC ORTHODOX CHURCH OF ST GEO |
| Dec 15, 2014 | 340215733 | Alteration Type II | PLAN EXAM - IN PROCESS | BOILER APPLICATION AS PER PLAN. NO CHANGE IN OCCUPANCY, USE OR EGRESS. | $30,000 | COPTIC ORTHODOX CHURCH OF ST GEO |
| Dec 13, 2014 | 320249281 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF PIPE SCAFFOLD FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS ... | $0 | COPTIC ORTHODOX CHURCH OF STGEOR |
| Nov 26, 2014 | 320205274 | Alteration Type III | SIGNED OFF | INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN ... | $0 | COPTIC ORTHODOX CHURCH OF ST GEO |
| Nov 26, 2014 | 320186678 | Alteration Type III | SIGNED OFF | INSTALLATION OF 284 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS, 148 LINEAR FEET ON 11TH AVE, 136 LI... | $0 | COPTIC ORTHODOX CHURCH OF ST GEO |
| Aug 22, 2011 | 320316421 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF PIPE SCAFFOLD FILED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATIO... | $0 | ADAMEX CONSTRUCTION,INC. |
| Jul 14, 2009 | 320049595 | Alteration Type II | PLAN EXAM - DISAPPROVED | SPRINKLER APPLICATION IN CONJUNCTION WITH NB 302312487 | $150,000 | COPTIC ORTHODOX CHURCH OF ST GEO |
| Jul 23, 2007 | 302350060 | Demolition | SIGNED OFF | — | $0 | COPTIC ORTHODOX CHURCH OF |
| Jun 27, 2007 | 302362351 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | PROPOSED BUILDERS PAVEMENT PLAN APPLICATION IN CONJUNCTION WITH NB 302312487. 132'-8" LINEAR FEET ON 11 AVENUE & ... | $0 | COPTIC ORTHODOX CHURCH OF ST GEO |