Skip to content

DOB violations

550 61 Street, Brooklyn • Block 05792 • Lot 0027

10 records

Violations issued by the Department of Buildings.

Issued Violation Type Category Description Disposed
Mar 4, 2026 26-00689 C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE PER RETAINING WALL UNIT INSPECTED ON 07232025, RETAINED WALL AT REAR CONSTRUCTED CONTRARY TO ALT B01025469, SIGN-OFF ...
Aug 14, 2025 RW30702BH C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONDITION: 072425CRW30702BH ISSUED ON JULY 24, 2025. UP TO...
Jul 24, 2025 RW30702BH C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENT. NOTED: AT TIME OF INSPECION WE NOTED THAT THE RW CONSTRUCTIO...
Jul 23, 2025 35409031Y C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE COMPROMISED STRUCTURE, NEEDS TO BE DEMOLISHED & REMOVED. AT TIME OF INSPECTION NOTED SUBJECT RETAINING WALL REPRESENT...
Oct 24, 2023 17917 EGNCY-EMERGENCY NONE V*-DOB VIOLATION - DISMISSED 1)ENCLOSED THE COLLAPSE ZONE WITH A CONSTRUCTION FENCE.2)IMMEDIATELY DEMOLISH ANY EXISTING REMNANTS OF THE REMAINING ... Mar 24, 2024
Oct 24, 2023 17917 EGNCY-EMERGENCY NONE V-DOB VIOLATION - ACTIVE ENCLOSED THE COLLAPSE ZONE WITH A CONSTRUCTION FENCE. 2) IMMEDIATELY D Y EXISTING REMNANTS OF THE REMAINING UNSTABLE ...
Oct 23, 2023 23-02969 C-CONSTRUCTION OTHER OPTIONAL V*-DOB VIOLATION - DISMISSED WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL ERECTED FULL HEIGHT PARTITIONS FOR ROOMS AND BATH. INSTALLED WATER/ WASTE ... Apr 15, 2024
Oct 23, 2023 23-02968 C-CONSTRUCTION OTHER OPTIONAL V*-DOB VIOLATION - DISMISSED RESIDENCE CONVERTED FROM A LEGAL 2 FAMILY TO 3 FAMILY BY CREATING CLASS A APT AT CELLAR LEVEL. DOB RECORDS INDICATES ... Apr 15, 2024
Sep 29, 2023 23-02761 C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE AT TIME OF INSPECTION OBSERVED RETAINING WALL AT REAR OF THE BUILDING COLLAPSE ONTO REAR YARD. DUE TO HEAVY RAIN. ENG...
Sep 29, 2023 23-02752 C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE Y-3 STRUCTURE RENDERED NON COMPLAINT. AT TIME OF INSPECTION OBSERVED RETAINING WALL AT REAR OF THE BUILDING COLLAPSE ...