DOB violations
6816 5 Avenue, Brooklyn • Block 05864 • Lot 0049
6 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Jun 20, 2023 | 00657 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 01867 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | — |
| May 2, 2017 | 1002SH | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | — | — |
| Mar 3, 2015 | 06519 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | — |
| Mar 26, 1999 | 10JL01 | C-CONSTRUCTION OTHER OPTIONAL | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | WORK WITHOUT A PERMIT. WORK NOTED: 2ND FLOOR APT. CLOSED UP DOORWAY IN PUBLIC HALLWAY. ERECTED SHEETROCK PARTITION CR... | Apr 12, 2019 |
| Mar 9, 1999 | 10J1 | C-CONSTRUCTION OTHER OPTIONAL | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | WORK WITHOUT A PERMIT. HAVING PLACE 3 STEEL SUPPORT POSTS AT FRONT SIDEWALK AREA WITH ROOFING TO FORM A CANOPY REMEDY... | Dec 26, 2018 |