ECB violations
324 93 Street, Brooklyn • Block 06107 • Lot 0015
9 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jun 21, 2024 | 39117416X | ACTIVE | CLASS - 2 | RCA WAS ISSUED ON 08/02/22 BY INSPECTOR BADGE # 3260 FOR FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER TO FILE A CER... | $6,250 | $6,250 | Aug 28, 2024 |
| Jun 6, 2024 | 39116183J | ACTIVE | CLASS - 2 | FOR FAILURE TO CONDUCT OR FILE A FINAL INSPECTION OF PERMITTED WORK WITH THE DEPARTMENT. RESPONDENT OBTAINED PERMIT N... | $6,250 | $6,250 | Aug 14, 2024 |
| Jul 27, 2021 | 35555290Y | RESOLVE | CLASS - 2 | SEC. 28-116.4 FAILURE TO COMPLY W/DOB'S REQUIREMENT FOR PERMIT SIGN OFF. NOTE AT THE TIME OF INSPECTION RECORD INDICA... | $0 | $0 | Dec 8, 2021 |
| Apr 7, 2017 | 35125756R | ACTIVE | CLASS - 1 | UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT APPARATUS,MATERIALS DEVICES,APPLIANCES OR WIRING.NOTED: ELECTRICAL ... | $8,000 | $0 | May 22, 2017 |
| Apr 7, 2017 | 35125757Z | ACTIVE | CLASS - 1 | FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT EXP3 EXCESSIVE CONSTRUCTION DEMOLITION DEBRIS STORED. WO... | $5,000 | $0 | May 22, 2017 |
| Apr 7, 2017 | 35125758K | RESOLVE | CLASS - 1 | PERFORMING UNLICENSED PLUMBING WORK W/O A MASTER PLUMBING LICENSE. NOTED: AT 1ST FLOOR,APARTMENT REMOVED FLOOR DRAINS... | $6,250 | $0 | May 22, 2017 |
| Apr 7, 2017 | 35125755P | RESOLVE | CLASS - 1 | ELECTRICAL WORK W/O A PERMIT. NOTED: AT 1ST FLR APT, REMOVED, INSTALL ED LIGHTING FIXTURES, SWITCHES, OUTLETS, BX CAB... | $4,000 | $0 | May 22, 2017 |
| Apr 7, 2017 | 35125753L | RESOLVE | CLASS - 1 | WORK W/O A PERMIT. NOTED: AT 1ST FLR APT AT EXP#3 INSTALLED FULL HEIGHT PARTITION WALLS, WOOD FRAMING, WALLS AT BATHR... | $1,630 | $0 | Jul 10, 2017 |
| Apr 7, 2017 | 35125754N | RESOLVE | CLASS - 1 | PLUMBING WORK W/O A PERMIT. NOTED: AT TIME OF INSPECTION INSTALLED NEWFLOOR DRAIN SHOWER BODY, COPPER WATER LINES IN ... | $4,000 | -$2,948 | May 22, 2017 |