Maintenance code violations
20 Avenue, Brooklyn • Block 06489 • Lot 0001
1,276 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Jun 29, 2026 | B | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET ASSEMBLY OF THE DOOR KNOB AT THE APARTMEN... | 5D | Aug 3, 2026 |
| Jun 29, 2026 | A | VIOLATION CLOSED | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE MOLD AT GROUTS JOINTS OF THE CERAMIC TI... | 5D | Oct 2, 2026 |
| Jun 29, 2026 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | 5D | Jul 13, 2026 |
| Jun 17, 2026 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE B... | 1D | Jul 22, 2026 |
| Jun 17, 2026 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3... | 1D | Jul 22, 2026 |
| Jun 17, 2026 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1... | 1D | Jul 22, 2026 |
| Jun 10, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 6D | Jul 15, 2026 |
| Jun 10, 2026 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 6A | Jul 15, 2026 |
| Jun 10, 2026 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2G | Jul 15, 2026 |
| Jun 10, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 6F | Jul 15, 2026 |
| Jun 10, 2026 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5D | Jul 15, 2026 |
| Jun 10, 2026 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4E | Jul 15, 2026 |
| Jun 10, 2026 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2D | Jul 15, 2026 |
| Jun 10, 2026 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 6B | Jul 15, 2026 |
| Jun 10, 2026 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3E | Jul 15, 2026 |
| Jun 10, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3C | Jul 15, 2026 |
| Jun 10, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2E | Jul 15, 2026 |
| Jun 10, 2026 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 6G | Jul 15, 2026 |
| Jun 10, 2026 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 1E | Jul 15, 2026 |
| Jun 10, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3D | Jul 15, 2026 |
| Jun 10, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4C | Jul 15, 2026 |
| Jun 10, 2026 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5G | Jul 15, 2026 |
| Jun 10, 2026 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 1B | Jul 15, 2026 |
| Jun 10, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3B | Jul 15, 2026 |
| Apr 27, 2026 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 30SQ.FT AT NORTH, EAST... | 3B | Jul 1, 2026 |
| Apr 20, 2026 | A | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL (LESS THAN 10 SQ F... | 3B | Jul 24, 2026 |
| Apr 20, 2026 | A | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WINDOW FRAME AT EAST WALL ( L... | 3B | Jul 24, 2026 |
| Apr 20, 2026 | C | VIOLATION DISMISSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd ... | 3B | May 16, 2026 |
| Apr 20, 2026 | A | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... WINDOW FRAME AT NORTH WALL ( LES... | 3B | Jul 24, 2026 |
| Feb 10, 2026 | B | VIOLATION DISMISSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT HOPPER DOOR AT COMPACTOR CLOSET AT PUBLIC ... | — | Mar 17, 2026 |
| Feb 10, 2026 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | — | Feb 24, 2026 |
| Feb 5, 2026 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN L... | 6G | Mar 12, 2026 |
| Feb 5, 2026 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN T... | 6G | Mar 12, 2026 |
| Jan 13, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 6B | Feb 17, 2026 |
| Jan 13, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4D | Feb 17, 2026 |
| Jan 13, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5A | Feb 17, 2026 |
| Jan 13, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4C | Feb 17, 2026 |
| Jan 13, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4B | Feb 17, 2026 |
| Jan 13, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 1B | Feb 17, 2026 |
| Jan 13, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2D | Feb 17, 2026 |
| Jan 13, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2G | Feb 17, 2026 |
| Jan 13, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 1C | Feb 17, 2026 |
| Jan 13, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5D | Feb 17, 2026 |
| Jan 13, 2026 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3F | Feb 17, 2026 |
| Jan 5, 2026 | C | VIOLATION CLOSED | § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO B... | 2E | Jan 9, 2026 |
| Jan 5, 2026 | C | VIOLATION CLOSED | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | 2E | Jan 9, 2026 |
| Sep 10, 2025 | B | VIOLATION DISMISSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT CEILING... | 1F | Oct 15, 2025 |
| Sep 10, 2025 | B | VIOLATION DISMISSED | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING ... | 1F | Oct 15, 2025 |
| Sep 10, 2025 | C | VIOLATION DISMISSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st ... | 1F | Oct 6, 2025 |
| Sep 10, 2025 | B | VIOLATION DISMISSED | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON ... | 1F | Oct 15, 2025 |