1541 East 4 Street, Brooklyn
Brooklyn • Block 06586 • Lot 0073 • Zip: 11230
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 6 days ago- Downtown Brooklyn 35 min 6 walking, 29 riding
- Union Square 39 min 6 walking, 33 riding
- Times Square 43 min 6 walking, 37 riding
- Fulton Street 43 min 6 walking, 37 riding
- Grand Central 49 min 6 walking, 43 riding
- Penn Station 50 min 6 walking, 44 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Bus
Places nearby
World Spa
No description yet
Ciorba de perișoare at Moldova
No description yet
La Palina
Old-school Italian eatery & bar prepping classic Neapolitan cuisine & housemade sangria since 1930.
Si n'shpi
Mediterranean restaurant
Djerdan Burek
Eastern European restaurant
Jules Pizza
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2021
-
Alteration Type I
2020
2019
-
DOB violation Apr 17, 2019
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
CLASS - 1
FAILURE TO MAINTAIN REQUIRED MEANS OF EGRESS AND OTHER ELEMENTS IN EXISTING BUILDING DURING CONSTRUCTION . THE TIME O...
-
CLASS - 1
FAILURE TO NOTIFY THE DEPARTMENT PRIOR TO COMMENCEMENT OF EARTHWORK AT THE TIME OF INSPECTION ON ACTIVE JOBSITE OF 3 ...
-
CLASS - 1
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS (NO OVERHEAD PROTECTION)AT TIME OF I...
-
CLASS - 1
FAILURE TO DESIGNATE AND OR HAVE CONSTRUCTION SUPERINTENDENT OR COMP- ETENT PERSON PRESENT WHEN REQUIRED.AT THE TIME ...
-
CLASS - 1
1704.1.1FAILURE TO FILE SPECIAL INSPECTION STATEMENT OF RESPONSIBILITYPRIOR TO PERMIT ISSUANCE AND PRIOR TO START OF ...
2018
2016
2006
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records