1449 East 8 Street, Brooklyn
Brooklyn • Block 06590 • Lot 0076 • Zip: 11230
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 5 days ago- Downtown Brooklyn 35 min 6 walking, 29 riding
- Union Square 39 min 6 walking, 33 riding
- Times Square 43 min 6 walking, 37 riding
- Fulton Street 43 min 6 walking, 37 riding
- Grand Central 49 min 6 walking, 43 riding
- Penn Station 50 min 6 walking, 44 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2009
-
New Building
-
Alteration Type III
APPLICATION FILED FOR BUILDERS PAVING PLAN - TOTAL FRONTAGE ON EAST 8TH STREET IS 40 LINEAL FEET - NB 302369069
-
Alteration Type III
APPLICATION FILED FOR CURB CUT - TOTAL CUT 7.5 LINEAL FEET INCLUDING SPLAY SEE SEC.24
-
Alteration Type II
PROVIDE VENTILATION AND AIR CONDITIONING IN CONJUNCTION WITH NB #302369069 AS PER PLANS FILED NO CHANGE IN USE OCCUPA...
2008
-
DOB violation Sep 24, 2008
C-CONSTRUCTION OTHER OPTIONAL
-
Hazardous
STOP ALL WORK. FAILURE TO ADEQUATELY PROTECT THE SIDES OF AN EXCAVATION CARRIED TO A DEPTH GREATER THAN 5'. NOTED: AT...
-
DOB violation Jan 15, 2008
C-CONSTRUCTION OTHER OPTIONAL
STOP ALL WORK FAILURE TO PROVIDE APPROVED PLANS OR SHOP DRAWINGS ON SITE AT TIME OF INSPECTION NOTED: AN ACTIVE SITE ...
2007
-
Demolition
-
Demolition
-
Hazardous
FAILURE TO COMPLY W/STOP WORK ORDER 8/14/07 PARTIAL 1FL OF FOUNDATION REMAINS.A STOP WORK ORDER WAS SERVED ON 8/14/07...
-
Hazardous
FAILURE TO SAFE GUARD PUBLIC&PROPERTY EFFECTED BY DEMO OPERATION. UPONINSPECTION AT 1449 E 8TH ST CONTRACTOR FINISH W...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records