Skip to content

Maintenance code violations

1516 West 10 Street, Brooklyn • Block 06596 • Lot 0013

339 records

HPD grades a violation A for non-hazardous through C for immediately hazardous.

Issued Class Status Violation Apartment Correct by
May 9, 2011 A VIOLATION CLOSED § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND WALLS IN THE EN... 3B Aug 12, 2011
May 9, 2011 A NOT COMPLIED WITH § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXIS... 3B Aug 12, 2011
May 9, 2011 A VIOLATION CLOSED § 27-2005 ADM CODE REFIT ENTRANCE DOOR LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST 3B Aug 12, 2011
May 9, 2011 B VIOLATION CLOSED § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BALANCE LOWER SASH WINDOW IN THE KITCHEN LOCATED AT APT 3B... 3B Jun 13, 2011
Apr 18, 2011 B VIOLATION CLOSED § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES .. IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, ... 3B May 23, 2011
Apr 18, 2011 A NOT COMPLIED WITH § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS TROUG... 3B Jul 22, 2011
Apr 18, 2011 A NOT COMPLIED WITH § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXIS... 3B Jul 22, 2011
Apr 18, 2011 A VIOLATION CLOSED § 27-2005 ADM CODE REFIT DOOR AT SOUTH IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3B, 3rd STORY 3B Jul 22, 2011
Apr 8, 2011 A NOT COMPLIED WITH § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXIS... 3B Jul 12, 2011
Apr 8, 2011 A NOT COMPLIED WITH § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS, WALLS AND TRIM THR... 3B Jul 12, 2011
Apr 8, 2011 A VIOLATION CLOSED § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE VANITY UNDER WASH BASIN IN THE BATHROOM LOCATED AT APT 3B,... 3B Jul 12, 2011
Mar 16, 2011 A NOT COMPLIED WITH § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS IN THE ENTIRE APARTMEN... 3B Jun 19, 2011
Mar 16, 2011 A NOT COMPLIED WITH § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXIS... 3B Jun 19, 2011
Mar 10, 2011 C VIOLATION CLOSED § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR Mar 16, 2011
Mar 3, 2011 C FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... 3C Mar 29, 2011
Mar 3, 2011 C FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... 3C Mar 29, 2011
Mar 3, 2011 C FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... 3C Mar 29, 2011
Mar 3, 2011 C FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... 3C Mar 29, 2011
Mar 3, 2011 C FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... 3C Mar 29, 2011
Mar 3, 2011 A FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT ... 3C Jun 6, 2011
Mar 3, 2011 A FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WE... 3C Jun 6, 2011
Mar 3, 2011 A FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST... 3C Jun 6, 2011
Mar 3, 2011 A FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT ... 3C Jun 6, 2011
Mar 3, 2011 B FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN BASIN SINK IN THE BATHROOM LOCATED AT APT 3C, 3r... 3C Apr 7, 2011
Mar 3, 2011 A FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHR... 3C Jun 6, 2011
Mar 3, 2011 C FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... 3C Mar 29, 2011
Dec 10, 2010 C FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED... 3C Jan 5, 2011
Dec 10, 2010 C FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED... 3C Jan 5, 2011
Dec 10, 2010 C FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED... 3C Jan 5, 2011
Nov 10, 2010 A NOT COMPLIED WITH § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE ENTIRE APAR... 3B Feb 13, 2011
Nov 10, 2010 A NOT COMPLIED WITH § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXIS... 3B Feb 13, 2011
Jul 9, 2010 A NOT COMPLIED WITH § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXIS... 3B Oct 12, 2010
Jul 8, 2010 A NOT COMPLIED WITH § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE... 3B Oct 11, 2010
Jun 28, 2010 B VIOLATION CLOSED § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE CRACKED WASH BASIN IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 2... 3B Aug 2, 2010
Jun 28, 2010 B NOT COMPLIED WITH § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST, NORTH AND WES... 3B Aug 2, 2010
Jun 28, 2010 A NOT COMPLIED WITH § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXIS... 3B Oct 1, 2010
Jun 25, 2010 A NOT COMPLIED WITH § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS, WALLS AND TRIM THR... 3B Sep 28, 2010
Jun 21, 2010 A NOT COMPLIED WITH § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS IN THE EN... 3B Sep 24, 2010
Jun 18, 2010 B VIOLATION CLOSED § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .... I... 3B Jul 23, 2010
Jun 18, 2010 B VIOLATION CLOSED § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE FOYE... 3B Jul 23, 2010
Mar 16, 2010 A VIOLATION CLOSED § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE PRIVATE HALLWAY LOCATED AT AP... 3B Jun 19, 2010
Mar 16, 2010 A NOT COMPLIED WITH § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING I... 3B Jun 19, 2010
Mar 16, 2010 A NOT COMPLIED WITH § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXIS... 3B Jun 19, 2010
Feb 25, 2010 C VIOLATION CLOSED § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR TO BOILER ROOM LOCK AT PUBLIC HALL, 1st STORY Mar 3, 2010
Nov 10, 2009 B FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... MILDEW UPPER NORTH WALL AT BA... 3C Dec 15, 2009
Oct 16, 2009 B NOT COMPLIED WITH § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS I... 3B Nov 20, 2009
Oct 16, 2009 B VIOLATION CLOSED § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PULL CHAIN SWITCH AT CEILING LIGHT FIXTURE IN THE FOYER LO... 3B Nov 20, 2009
Oct 16, 2009 B VIOLATION CLOSED § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES .. IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STO... 3B Nov 20, 2009
Oct 16, 2009 A NOT COMPLIED WITH § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXIS... 3B Jan 19, 2010
Apr 30, 2009 A NOT COMPLIED WITH § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND WALLS IN THE EN... 3B Aug 3, 2009