May 29, 2026 39554753M RESOLVE CLASS - 1 AT TIME OF INSPECTION, EXTERIOR FACADE WORK WAS FOUND COMPLETED. COMPLAINT NO. 3A53086 RESULTED IN A PARTIAL STOP WOR... $10,000 $10,000 Dec 1, 2026
Mar 18, 2026 39551960L RESOLVE CLASS - 1 BC 3307.2.1 AT THE TIME OF MY INSPECTION OF A 8 STORY NEW BUILDING TOP OFF, I OBSERVED STORAGE CONTAINER ON STREET AT... $5,000 $5,000 Feb 23, 2027
Mar 18, 2026 39551961N RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION OF A 8 STORY NEW BUILDING TOP OFF, I OBSERVED WORKERS INSTALLING BALCONY RAILS AT EXPOSU... $5,000 $5,000 Feb 23, 2027
Mar 18, 2026 39551962P RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION OF A 8 STORY NEW BUILDING TOP OFF, I OBSERVED WORKERS INSTALLING BALCONY RAILS AT EXPOSU... $4,800 $4,800 Feb 23, 2027
Mar 18, 2026 39551963R RESOLVE CLASS - 2 AT THE TIME OF MY INSPECTION OF A 8 STORY NEW BUILDING TOP OFF, I OBSERVED WORKERS INSTALLING BALCONY RAILS AT EXPOSU... $5,000 $5,000 Feb 23, 2027
Mar 11, 2026 39551553Y RESOLVE CLASS - 2 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. ATTHE TIME OF INSPECTION AT THE ACTIVE JOB SITE O... $1,280 $1,280 Apr 8, 2027
Mar 11, 2026 39551554X RESOLVE CLASS - 2 MISCELLANEOUS VIOLATIONS. BC3303.7.2-DURING MY INSPECTION OF A 8 STORYNB ACTIVE JOB SITE, I OBSERVED THAT THE FIRE EX... $2,530 $2,530 Apr 8, 2027
Mar 11, 2026 39551557L RESOLVE CLASS - 2 FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33. DURING MY INSPECTION OF AN ACTIVE 8-STORY NE... $1,280 $1,280 Apr 8, 2027
Mar 11, 2026 39551556J RESOLVE CLASS - 2 FAILURE TO POST. NO SMOKING SIGNS AT CONSTRUCTION SITES PER FIRE CODE.DURING MY INSPECTION OF AN ACTIVE 8-STORY NB JO... $1,280 $1,280 Apr 8, 2027
Mar 11, 2026 39551555H RESOLVE CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. DURING THE INSPECTION, IT WAS OBSERVED THAT THE SIDEWALK SHE... $2,430 $2,430 Apr 8, 2027
Mar 11, 2026 39551552M RESOLVE CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO HANDRAILS. DURING THE INSPECTION... $2,530 $2,530 Apr 8, 2027
Jan 16, 2026 39549235X RESOLVE CLASS - 1 STOP WORK ORDER WAS ISSUED 10/6/25 NO WORK ENTIRE SITE ABOVE 75'. COMPARING PREVIOUS PICS TO CURRENT PICS. OBSERVED T... $12,500 $12,500 Mar 1, 2027
Jan 2, 2026 39548640P RESOLVE CLASS - 2 MISCELLANEOUS VIOLATIONS.BC 3303.12 AT THE TIME OF MY INSPECTION OF ANEIGHT-STORY NEW BUILDING,I OBSERVED THAT THE ST... $2,500 $2,500 Jan 4, 2027
Nov 6, 2025 39546734R RESOLVE CLASS - 2 3301.13.5- ACTIVE JOBSITE, CS #028113, WITHDREW FROM APPLICATION B01008423B ON 11-05-2025, HAVING ALL PERMITS IN CONJ... $2,500 $2,500 Sep 15, 2026
Nov 6, 2025 39546736K RESOLVE CLASS - 2 ACTIVE 8-STORY PROPOSED NB. OBSERVED DIESEL FUELED GENERATOR IN USE IN PARKING LANE STORAGE AREA AT EXPO 1. UPON RESE... $2,400 $2,400 Sep 15, 2026
Nov 6, 2025 39546735Z RESOLVE CLASS - 2 3301.13.12- ACTIVE 8-STORY NB JOBSITE. CS #028113 WITHDREW FROM PERMIT ON 11/5/2025. NO DESIGNATION OF A COMPETENT PE... $2,500 $2,500 Sep 15, 2026
Nov 6, 2025 39546737M RESOLVE CLASS - 2 ACTIVE 8-STORY PROPOSED NB. OBSERVED SUPPORTED PIPE SCAFFOLD IN USE AT ALL EXPOS. REVIEW OF APPROVED PLANS SHOWS SCAF... $0 $0 Feb 11, 2026
Oct 6, 2025 39545708Z RESOLVE CLASS - 1 BC 3303.12 AT THE TIME OF MY INSPECTION OF AN EIGHT-STORY NEW BUILDING, I OBSERVED THAT THE STRUCTURE EXCEEDS 75 FEET... $5,000 $5,000 Aug 27, 2026
Sep 27, 2025 39545408R RESOLVE CLASS - 1 AT TIME OF INSPECTION, SITE NOT ACTIVE; OBSERVED AT EXPOSURE 1 THROUGH CONSTRUCTION FENCE DRY STANDPIPE GAUGE READING... $5,000 $5,000 Aug 17, 2026
Aug 15, 2025 39543735P RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION, BUILDING AT 3 FLOOR DECKING LEVEL, I OBSERVED 7 WORKERS ON JOBSITE INSTALLING SIDEWALK ... $1,250 $1,250 May 6, 2026
Aug 15, 2025 39543737Z RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION, BUILDING AT 3 FLOOR DECKING LEVEL, I OBSERVED WORKERS INSTALLING REBAR AND SCAFFOLDING ... $5,000 $5,000 Jan 19, 2027
Aug 15, 2025 39543734N RESOLVE CLASS - 1 BC 3307.2.1 AT THE TIME OF MY INSPECTION OF A 8 STORY NEW BUILDING, I OBSERVED SIDEWALK SHED IN THE PROCESS OF INSTAL... $625 $625 Jun 23, 2026
May 29, 2025 39540747Z RESOLVE CLASS - 2 UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1 WITH A INADEQUATE FENCE PROJECT INFO PROVIDED CONTRARY TO COD... $1,250 $0 Mar 12, 2026
May 20, 2025 39540402N RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING FULL DEMOLITION, I OBSERVED BUILDING DEMO TO APPROXIMATELY 5 TO 6 ... $2,500 $2,500 Mar 12, 2026
May 20, 2025 39540404R RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION, I OBSERVED BUILDING DEMO TO APPROXIMATELY 5 TO 6 FEET ABOVE GRADE WITH AN EXCAVATOR ON ... $5,000 $5,000 Mar 12, 2026
May 7, 2025 39539919H RESOLVE CLASS - 1 SWO WAS ISSUED ON 4/24/25 FOR NO CONSTRUCTION OPERATIONS ENTIRE SITE. PREVIOUS CONDITIONS SHOWED THERE WAS A BUILDING... $10,000 $10,000 Sep 14, 2026
Apr 24, 2025 39539524N RESOLVE CLASS - 1 BC3303.4.1.2. AT THE TIME OF INSPECTION, A FULL DEMOLITION OF A TWO-STORY BUILDING WAS OBSERVED TO BE IN PROGRESS. A ... $2,500 $2,500 Aug 10, 2026
Apr 24, 2025 39539506J RESOLVE CLASS - 1 AT THE TIME OF INSPECTION, A FULL DEMOLITION OF A TWO-STORY BUILDING WAS OBSERVED IN PROGRESS. THE DEMOLITION WAS BEI... $5,000 $5,000 Aug 10, 2026
Apr 24, 2025 39539523L RESOLVE CLASS - 2 AT THE TIME OF INSPECTION, A FULL DEMOLITION OF A TWO-STORY BUILDING WAS OBSERVED IN PROGRESS, WITHOUT PROVIDING THE ... $5,000 $5,000 Dec 28, 2026
Apr 24, 2025 39539511Y RESOLVE CLASS - 1 AT THE TIME OF INSPECTION, A FULL DEMOLITION OF A TWO-STORY BUILDING WAS OBSERVED IN PROGRESS. THE DEMOLITION ACTIVIT... $0 $0 Aug 10, 2026
Feb 12, 2020 38272990Y RESOLVE CLASS - 1 CEASE USE 16A17: (16,A,17) HOISTWAY DOORS JUMPED OUT, UNIT STILL WORKSWITH DOORS OPEN. CEASE USE. REPAIR AND REINSPEC... $0 $0 Jan 22, 2021