Maintenance code violations
2625-2649 East 13 Street, Brooklyn • Block 07458 • Lot 0062
386 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Jul 6, 2026 | C | NOT COMPLIED WITH | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | — | Jul 20, 2026 |
| Jul 6, 2026 | B | NOT COMPLIED WITH | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT COMPACTOR CLOSET, 3rd STORY | — | Aug 10, 2026 |
| Jul 6, 2026 | C | VIOLATION WILL BE REINSPECTED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | — | Jul 20, 2026 |
| Jul 6, 2026 | B | NOT COMPLIED WITH | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT HOPPER DOOR AT COMPACTOR CLOSET, 3rd S... | — | Aug 10, 2026 |
| Apr 8, 2026 | B | NOT COMPLIED WITH | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT THE CEILIN... | 7B | May 13, 2026 |
| Apr 2, 2026 | A | NOT COMPLIED WITH | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A C... | — | Jul 6, 2026 |
| Mar 30, 2026 | C | FIRST NO ACCESS TO RE- INSPECT VIOLATION | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 2nd ... | 3D | Apr 25, 2026 |
| Mar 11, 2026 | C | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 2nd ROOM FROM EAST LOCATED AT APT 3D, 3rd STORY... | 3D | Mar 10, 2026 |
| Mar 11, 2026 | C | VIOLATION CLOSED | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR AT BOILER ROOM | — | Mar 17, 2026 |
| Jan 20, 2026 | B | VIOLATION CLOSED | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING ... | 7H | Feb 24, 2026 |
| Jan 20, 2026 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT... | — | Jan 26, 2026 |
| Dec 29, 2025 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING AT CELLAR | — | Feb 2, 2026 |
| Dec 29, 2025 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE CEILI... | — | Feb 2, 2026 |
| Dec 24, 2025 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE WEST WALL IN THE 1st RO... | 7H | Jan 28, 2026 |
| Dec 24, 2025 | C | VIOLATION CLOSED | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 7H, 6th STORY, ... | 7H | Dec 24, 2025 |
| Dec 24, 2025 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE WEST WALL IN... | 7H | Jan 28, 2026 |
| Dec 22, 2025 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE F... | 7F | Jan 26, 2026 |
| Dec 22, 2025 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE FOYER LOCATE... | 7F | Jan 26, 2026 |
| Dec 22, 2025 | A | NOT COMPLIED WITH | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RISER IN THE BATHROOM LOCATED AT APT 7F, 7th STORY... | 7F | Mar 27, 2026 |
| Dec 22, 2025 | C | DEFECT LETTER ISSUED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7F, 7th ... | 7F | Jan 17, 2026 |
| Dec 22, 2025 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE KITCHEN LO... | 7F | Mar 27, 2026 |
| Dec 9, 2025 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT CELLAR AT PUB... | — | Mar 14, 2026 |
| Dec 9, 2025 | A | VIOLATION CLOSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT THE CEILIN... | 7B | Mar 14, 2026 |
| Dec 9, 2025 | C | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT LOWER WINDOW SASH AT THE EAST WA... | 7B | Dec 15, 2025 |
| Dec 9, 2025 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WIND... | 7B | Jan 13, 2026 |
| Dec 9, 2025 | C | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT UPPER WINDOW SASH AT 1ST WINDOW FROM ... | 7B | Dec 15, 2025 |
| Dec 9, 2025 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE CEILI... | — | Jan 13, 2026 |
| Dec 9, 2025 | B | NOT COMPLIED WITH | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHR... | 7B | Jan 13, 2026 |
| Dec 9, 2025 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE CEILI... | — | Jan 13, 2026 |
| Dec 9, 2025 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, ... | — | Mar 14, 2026 |
| Dec 9, 2025 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4... | 7B | Jan 13, 2026 |
| Dec 9, 2025 | B | NOT COMPLIED WITH | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT THE CEILING IN THE PRIVATE HALLWAY... | 7B | Jan 13, 2026 |
| Dec 9, 2025 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | — | Dec 23, 2025 |
| Dec 9, 2025 | C | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER WINDOW SASH AT 2ND WINDOW FROM ... | 7B | Dec 15, 2025 |
| Dec 9, 2025 | C | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT LOWER WINDOW SASH AT 2ND WINDOW ... | 7B | Dec 15, 2025 |
| Dec 9, 2025 | B | NOT COMPLIED WITH | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON ... | 7B | Jan 13, 2026 |
| Dec 9, 2025 | B | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF WINDOW RECESS IN THE 1st ROOM FROM NORTH LOCATED AT AP... | 7B | Jan 13, 2026 |
| Dec 9, 2025 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT A... | 7B | Jan 13, 2026 |
| Dec 9, 2025 | B | NOT COMPLIED WITH | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING ... | 7B | Jan 13, 2026 |
| Dec 9, 2025 | B | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT LAUNDRY ROOM DOOR AT CELLAR AT PUBLIC ... | — | Jan 13, 2026 |
| Dec 9, 2025 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT CELLAR AT PUBLIC... | — | Jan 13, 2026 |
| Dec 9, 2025 | C | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT LOWER WINDOW SASH AT 2ND WINDOW ... | 7B | Dec 15, 2025 |
| Nov 28, 2025 | B | VIOLATION CLOSED | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING ... | 3M | Jan 2, 2026 |
| Nov 28, 2025 | B | VIOLATION CLOSED | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON ... | 3M | Jan 2, 2026 |
| Nov 20, 2025 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE AT BATHTUB IN... | 7H | Feb 23, 2026 |
| Nov 20, 2025 | C | VIOLATION CLOSED | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF \HOT WATER EXCEEDING THE MAXIMUM ALLOWABLE TEMPERAT... | 7H | Nov 26, 2025 |
| Nov 20, 2025 | A | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WAL... | 7H | Feb 23, 2026 |
| Nov 20, 2025 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT CEILING... | 7H | Dec 25, 2025 |
| Nov 19, 2025 | C | DEFECT LETTER ISSUED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7H, 7th ... | 7H | Dec 15, 2025 |
| Nov 19, 2025 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ.FT AT CEILING... | 7H | Dec 24, 2025 |