2236-2244 Nostrand Avenue, Brooklyn
Brooklyn • Block 07575 • Lot 0068 • Zip: 11210
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Downtown Brooklyn 35 min 6 walking, 29 riding
- Union Square 39 min 6 walking, 33 riding
- Times Square 43 min 6 walking, 37 riding
- Fulton Street 43 min 6 walking, 37 riding
- Grand Central 49 min 6 walking, 43 riding
- Penn Station 50 min 6 walking, 44 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2023
2022
-
CLASS - 2
ATTHE TIME OF INSPECTION I REQUESTED THE SITE SAFETY PLAN FROM THE COMPETENT PERSON. I WAITED FOR COMPETENT PERSON TO...
2021
-
DOB violation Aug 2, 2021
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-
DOB violation Jun 2, 2021
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-
DOB violation Apr 29, 2021
EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
-
DOB violation Feb 2, 2021
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020
-
DOB violation Nov 18, 2020
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Nov 2, 2020
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2017
2016
-
Alteration Type II
MODIFICATION TO EXISTING PLUMBING AND MECHANICAL SYSTEM.
2015
-
Alteration Type II
NIKE FACTORY STORE - GENERAL CONSTRUCTION INCLUSIVE OF INTERIOR PARTITIONS FOR RETAIL STORE BUILD-OUT AS PER PLANS FI...
-
Alteration Type III
BPP FILED HEREWITH TO SATISFY DOT REQUIREMENT FOR LIGHT POLE RELOCATION. TOTAL LINEAR FRONTAGE IS 80'.
-
Alteration Type III
BPP FILED HEREWITH TO SATISFY DOT REQUIREMENT FOR LIGHT POLE RELOCATION. TOTAL LINEAR FRONTAGE IS 80'.
-
Alteration Type II
Modification to existing sprinkler system and installation of standpipe system w ith new standpipe service. No change...
2014
-
Alteration Type II
RENOVATE EXISTING STORE.REMOVE AND INSTA LL NEW NON-LOAD BEARING PARTITI NS AND FINISHES AS PER PLANS FILED HEREW ITH...
-
CLASS - 1
WORK W/O PERMIT. AT NORTH WALL APPROX 50' IN FROM FRONT OF BLDG. REMOVED STRUCTURAL STEEL AT 2ND FL TO INSTALL NEW ST...
-
CLASS - 1
UNAPPROVED,UNSAFE,UNSUITABLE.ELECTRICAL EQUIPEMENT,APPARTUS,MATERIALS,DEVICES,DEFECTIVE WIRING IS IN USE.NOTED:THROUG...
-
CLASS - 1
WORK W/O A PERMIT:OBSERVED @ APPROX:10:30AM,INSTALLATION OF S.O CORD PERMANTLY WIRED TO THE MAIN LUGS OF 2 PANELS ON ...
-
CLASS - 1
PERFORMANCE OF UNLICENSED ELECTRICAL:NOTED-@ TIME OF INSP ON 08/30/14 @ APPROX.10:30AM,1ST FL-DISC JOCKEY IMPROPERLY ...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records