2318-2340 Nostrand Avenue, Brooklyn
Brooklyn • Block 07593 • Lot 0061 • Zip: 11210
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 5 days ago- Downtown Brooklyn 35 min 6 walking, 29 riding
- Union Square 39 min 6 walking, 33 riding
- Times Square 43 min 6 walking, 37 riding
- Fulton Street 43 min 6 walking, 37 riding
- Grand Central 49 min 6 walking, 43 riding
- Penn Station 50 min 6 walking, 44 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
DOB violation Nov 14, 2025
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2023
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2020
-
Alteration Type II
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING ONE STORY AND CELLAR COMMERCIAL BUILDING.
2019
-
DOB violation Nov 8, 2019
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
-
DOB violation Oct 17, 2019
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Oct 17, 2019
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
CLASS - 2
OVERHEAD PROTECTION AT TIME OF INSPECTION OF A COMMERICIAL BUILDING UNERGOING VERTICAL AND HORIZONTAL ENLARGMENT CONS...
-
CLASS - 1
NO PERMIT FOR STEEL CONSTRUCTION NOTE AT TIME OF INSPECTION ON AN ACTIEV JOBSITE I OBSERVED THE ERECTION OF STEEL BEA...
-
CLASS - 1
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS NOTE AT TIME OF MY INSPECTION FO ...
-
CLASS - 2
FAILURE TO SFAEGUARD ALL (BEUGONS) AND PROPERTY AFFECTED BY COSNTRUCTEDOPERATIOS NOTE AT TIME OF MY INSPECTION OF A B...
-
CLASS - 1
FAILURE TO MAINTAIN DISPLAY DOCUMENT CONSTRUCTION DOCUMENT ON SITE AS REQUIRED BY CODE NOTE AT THE TIME OF INSPECTION...
-
CLASS - 1
JOBSITE FENCE MISSING NOTE AT TIME OF MY INSPECTION OF A COMMERCIAL BUILDING BEING HORIZONTALLY AND VERTICALLY ENLARG...
2018
-
DOB violation Apr 6, 2018
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2009
-
Alteration Type III
PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY ...
2000
-
Alteration Type II
LEGALIZE INSTALLATION OF GAS FIRED HOT W ATER BOILER TO CORRECT ECB VIOL TION 32018898J.NO CHANGE IN EGRESS,OCCUP ANC...
1996
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records