Skip to content

ECB violations

1853-1863 Albany Avenue, Brooklyn • Block 07767 • Lot 0009

14 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Dec 1, 2025 35717839L RESOLVE CLASS - 1 FAILURE TO INSTITUTE SAFETY EQUIP MEASURE OR TEMPORARY CONSTRUCTION-NOGUARDRAILS. AS NOTED: AT TIME OF INSPECTION AT ... $5,000 $5,000 Aug 25, 2026
Dec 1, 2025 35717843Y RESOLVE CLASS - 1 FAILURE TO PROVIDE MASONRY CMU WALL CONSTRUCTION BRACING PLAN IN ACCORDANCE TO TMS602/ACI 530.1, ASCE 6 SECTION 33E. ... $0 $0 Feb 4, 2026
Dec 1, 2025 35717838J RESOLVE CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIP MEASURE/TEMPORARY CONSTRUCTION "NO HANDRAIL". AS NOTED: AT TIME OF INSPECT... $2,500 $2,500 Aug 25, 2026
May 30, 2025 39540809P RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING, I OBSERVED 3 WORKERS ON JOBSITE DOING INTERIOR DEMOLITION, UPON R... $5,030 $5,030 Feb 16, 2027
May 30, 2025 39540810M RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING, I OBSERVED 3 WORKERS ON JOBSITE DOING INTERIOR DEMOLITION, UPON R... $2,530 $2,530 Feb 16, 2027
May 30, 2025 39540811Y RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING, I OBSERVED 3 WORKERS ON JOBSITE DOING INTERIOR DEMOLITION, UPON R... $5,030 $5,030 Feb 16, 2027
Apr 17, 2025 39539209N RESOLVE CLASS - 2 I OBSERVED CONSTRUCTION FENCE INSTALLED AT EXPOSURES 1,2 & 4 CONTRARY TO CODE. NO VIEWING PANELS INSTALLED. NOT PAINT... $2,500 $2,500 Aug 21, 2026
Apr 17, 2025 39539217N RESOLVE CLASS - 2 UPON INSPECTION OF AN NON ACTIVE ALT CONSTRUCTION SITE I OBSERVED NO FIRE EXTINGUISHERS PROVIDED ON SITE CONTRARY TO ... $5,000 $5,000 Sep 4, 2026
Apr 17, 2025 39539219R RESOLVE CLASS - 2 UPON INSPECTION OF A NON ACTIVE UNSECURED CONSTRUCTION SITE I OBSERVED MULTIPLE HAZARDOUS CONDITIONS WHICH RESULTED I... $5,000 $5,000 Sep 4, 2026
Apr 17, 2025 39539210K RESOLVE CLASS - 2 UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOSURES 1,2 AND 4 WITH NOT PROJECT INFO PANEL INSTALLED CONTRARY TO... $3,125 $3,125 Aug 21, 2026
Apr 17, 2025 39539201Z RESOLVE CLASS - 2 UPON INSPECTION OF A NON ACTIVE 2 STORY ALT IN EXCAVATION/FOUNDATION PHASE I OBSERVED THE FENCE AT EXPOSURE 2 REAR OP... $5,000 $5,000 Aug 21, 2026
Apr 17, 2025 39539203M RESOLVE CLASS - 1 UPON INSPECTION OF A NON ACTIVE PROPOSED 2 STORY ALT IN EXCAVATION/FOUNDATION PHASE I OBSERVED EXCAVATION DEEPER THAN... $6,250 $6,250 Aug 21, 2026
Apr 17, 2025 39539204Y RESOLVE CLASS - 1 UPON INSPECTION OF AN UNSECURED NON ACTIVE ALT CONSTRUCTION SITE IN EXCAVATION/FOUNDATION PHASE I OBSERVED EXCAVATION... $12,500 $12,500 Aug 21, 2026
Apr 17, 2025 39539208L RESOLVE CLASS - 1 UPON INSPECTION OF AN UNSECURED NON ACTIVE SITE I OBSERVED INADEQUATE HOUSEKEEPING PRACTICES THAT ARE POTENTIAL FIRE ... $6,250 $6,250 Sep 4, 2026