Skip to content

DOB violations

Glenwood Houses, Brooklyn • Block 07978 • Lot 0001

170 records

Violations issued by the Department of Buildings.

Issued Violation Type Category Description Disposed
Jun 30, 2023 04976 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION Oct 8, 2024
Jun 30, 2023 33110 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION Nov 25, 2024
Jun 30, 2023 22707 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION Oct 16, 2024
Jun 30, 2023 43597 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION Oct 16, 2024
Jun 30, 2023 24675 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION Oct 8, 2024
Jun 30, 2023 12729 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION Nov 25, 2024
Jun 30, 2023 33111 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION Nov 25, 2024
Jun 30, 2023 24677 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION Oct 16, 2024
Jun 30, 2023 12730 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION Nov 25, 2024
Jun 30, 2023 04977 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION Oct 15, 2024
Jun 30, 2023 04978 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION Oct 16, 2024
Jun 30, 2023 24676 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION Oct 15, 2024
Apr 25, 2023 18223 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION Mar 8, 2024
Apr 25, 2023 18224 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION Mar 8, 2024
Feb 22, 2023 00181 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00182 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00177 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00178 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00189 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00171 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00170 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00172 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00173 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00183 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00175 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00176 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00188 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00192 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00179 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00180 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00185 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00186 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00187 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 00174 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V-DOB VIOLATION - ACTIVE FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Jan 26, 2018 00408 ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED V*-DOB VIOLATION - DISMISSED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST Jun 14, 2018
Sep 15, 2017 00187 HVIOS-NYCHA ELEV ANNUAL INSPECTION/TEST ELEVATORREQUIRED V*-DOB VIOLATION - DISMISSED VIO ISSUED TO NYCHA ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST Nov 24, 2017
Sep 15, 2017 00188 HVIOS-NYCHA ELEV ANNUAL INSPECTION/TEST ELEVATORREQUIRED V*-DOB VIOLATION - DISMISSED VIO ISSUED TO NYCHA ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST Nov 24, 2017
Aug 30, 2013 01341 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V*-DOB VIOLATION - DISMISSED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 Oct 27, 2014
Aug 30, 2013 01342 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V*-DOB VIOLATION - DISMISSED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 Oct 27, 2014
Aug 30, 2013 01601 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V*-DOB VIOLATION - DISMISSED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 Oct 27, 2014
Aug 30, 2013 01340 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V*-DOB VIOLATION - DISMISSED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 Oct 27, 2014
Aug 30, 2013 01521 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V*-DOB VIOLATION - DISMISSED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 Oct 27, 2014
Aug 30, 2013 01616 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V*-DOB VIOLATION - DISMISSED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 Oct 27, 2014
Aug 30, 2013 01343 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V*-DOB VIOLATION - DISMISSED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 Oct 27, 2014
Aug 30, 2013 01620 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V*-DOB VIOLATION - DISMISSED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 Oct 27, 2014
Aug 30, 2013 01625 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V*-DOB VIOLATION - DISMISSED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 Oct 27, 2014
Aug 30, 2013 01508 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V*-DOB VIOLATION - DISMISSED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 Oct 27, 2014
Aug 30, 2013 01622 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V*-DOB VIOLATION - DISMISSED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 Oct 27, 2014
Aug 30, 2013 01623 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V*-DOB VIOLATION - DISMISSED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 Oct 27, 2014
Aug 30, 2013 01592 FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED V*-DOB VIOLATION - DISMISSED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 Oct 27, 2014