Skip to content

ECB violations

937 East 108 Street, Brooklyn • Block 08235 • Lot 0341

10 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Jun 16, 2026 39555558L RESOLVE CLASS - 2 UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1,2&4 NOT CONSTRUCTED OR MAINTAINED ACCORDING TO CODE. FENCE DA... $1,000 $1,000 Aug 26, 2026
Jun 16, 2026 39555567N RESOLVE CLASS - 2 UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1 WITH NO SIDEWALK SHED PROJECT INFO PANEL INSTALLED CO... $1,250 $1,250 Aug 26, 2026
Jun 16, 2026 39555573J RESOLVE CLASS - 2 UPON INSPECTION I OBSERVED A SIDEWALK SHED WITH A FENCE INSTALLED ON BOTH SIDES WITH A PROVIDED PEDESTRIAN SIDEWALK P... $2,500 $2,500 Aug 26, 2026
Jun 16, 2026 39555569R ACTIVE CLASS - 2 UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1 WITH A INADEQUATE FENCE PROJECT INFO PANEL INSTALLED. PRIMARY... $1,250 $1,250 Aug 26, 2026
Jun 16, 2026 39555582L ACTIVE CLASS - 2 UPON INSPECTION OF A NON-ACTIVE 7 STORY NB WITH A BUILDING FOOT PRINT 10142 SQ. FT UNDER FULL STOP WORK ORDER I OBSER... $2,500 $2,500 Aug 26, 2026
Jun 14, 2026 39555484H RESOLVE CLASS - 1 BC3310.4 AT THE TIME OF MY INSPECTION,I OBSERVED SITE AT 2ND FLOOR DECKING,UPON REVIEW OF THE DETERMINATION/APPEAL IT... $5,000 $5,000 Aug 19, 2026
Apr 28, 2026 39553589P RESOLVE CLASS - 1 AC 15 RCNY 20-08(B) AT THE TIME OF MY INSPECTION OF A 8 STORY NEW BUILDING AT FOUNDATION/EXCAVATION PHASE, I OBSERVE ... $2,500 $2,500 Feb 25, 2027
Apr 28, 2026 39553590M RESOLVE CLASS - 1 BC 3303.15.1AT THE TIME OF MY INSPECTION OF A 8 STORY NEW BUILDING AT FOUNDATION/EXCAVATION PHASE, I OBSERVE CONCRETE... $5,000 $5,000 Feb 25, 2027
Apr 28, 2026 39553591Y RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION OF A 8 STORY NEW BUILDING AT FOUNDATION/EXCAVATION PHASE, UPON REVIEW OF THE DEPARTMENT ... $2,500 $2,500 Feb 25, 2027
Apr 28, 2026 39553592X RESOLVE CLASS - 1 BC3301.13.5 AT THE TIME OF MY INSPECTION OF A 8 STORY NEW BUILDING AT FOUNDATION/EXCAVATION PHASE, UPON REVIEW OF THE... $5,000 $5,000 Feb 25, 2027