DOB violations
2015 Rockaway Parkway, Brooklyn • Block 08329 • Lot 0001
57 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Nov 14, 2025 | 14313 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | — |
| Sep 23, 2024 | 13075 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | — |
| Jun 30, 2023 | 06316 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | — |
| Jun 20, 2023 | 27677 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | — |
| Jun 20, 2023 | 06210 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | — |
| Apr 25, 2023 | 18933 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION | — |
| Mar 16, 2020 | 00602 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | — |
| Mar 16, 2020 | 00577 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | — |
| Sep 6, 2019 | 00296 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST | Jun 11, 2020 |
| Apr 5, 2019 | 00032 | HVIOS-NYCHA ELEV ANNUAL INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR-FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST | Aug 5, 2019 |
| Jun 22, 2018 | 00181 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION | — |
| Jan 26, 2018 | 00435 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST | Mar 22, 2018 |
| Jan 26, 2018 | 00436 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST | Mar 22, 2018 |
| Jan 26, 2018 | 00437 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST | Mar 22, 2018 |
| Jun 23, 2017 | 00203 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION | — |
| Jan 3, 2017 | 01394 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Feb 14, 2017 |
| Jan 3, 2017 | 01395 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jun 12, 2017 |
| Jan 3, 2017 | 01396 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jun 12, 2017 |
| Jan 3, 2017 | 01397 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Feb 6, 2017 |
| Jan 3, 2017 | 01398 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Mar 9, 2017 |
| Jan 3, 2017 | 01399 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jun 12, 2017 |
| Jan 3, 2017 | 01400 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jun 12, 2017 |
| Jan 3, 2017 | 01401 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jun 12, 2017 |
| Jan 3, 2017 | 00227 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jan 18, 2017 |
| Jan 3, 2017 | 00226 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jan 18, 2017 |
| Jan 3, 2017 | 00228 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jan 18, 2017 |
| Jan 3, 2017 | 00229 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jan 19, 2017 |
| Jan 3, 2017 | 00230 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jan 19, 2017 |
| Jan 3, 2017 | 01178 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jan 24, 2017 |
| Jan 3, 2017 | 01393 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jun 12, 2017 |
| Dec 16, 2016 | 00163 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION | — |
| Oct 1, 2015 | 10653 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | — |
| Mar 3, 2015 | 00577 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION | — |
| May 15, 2014 | 00107 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION | — |
| Feb 27, 2009 | 02810 | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Dec 15, 2011 |
| Jan 19, 2007 | 19530 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Mar 19, 2001 | 3CT3 | P-PLUMBING NONE | V-DOB VIOLATION - ACTIVE | HAZARDOUS | — |
| Mar 19, 2001 | 3CT2 | C-CONSTRUCTION OTHER OPTIONAL | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | PLUMBING WORK WITHOUT A PERMIT. INSTALLED SINK WITH WASTE LINE TO CELLAR IN P.V.C REMEDY: OBTAIN A PERMIT IF FEASIBLE... | — |
| Dec 11, 1992 | H51619-01 | B-BOILER BOILER OPTIONAL | VP-VIOLATION UNSERVED ECB-ACTIVE | — | — |
| Apr 7, 1992 | 04175 | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL | V*-DOB VIOLATION - DISMISSED | 1 | Dec 8, 2011 |
| Jun 29, 1990 | 04220 | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL | V*-DOB VIOLATION - DISMISSED | 1 | Oct 26, 2011 |
| May 10, 1990 | 1228D/1 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 16, 1990 |
| Nov 14, 1989 | 1228D/2 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Nov 27, 2013 |
| Nov 13, 1989 | 1228D/1 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Nov 27, 2013 |
| Nov 13, 1989 | 1228D/2 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Nov 27, 2013 |
| Nov 9, 1989 | 1228D/1 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Nov 27, 2013 |
| Feb 8, 1989 | 1214D/03 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | (51) RENEW BROKEN LINING | Feb 8, 1989 |
| Feb 8, 1989 | 1214D/01 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jun 14, 1989 |
| Feb 8, 1989 | 1214D/02 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | (53) 3RD FLOOR | Apr 19, 2016 |
| Feb 7, 1989 | 1214D/01 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | (03) 5TH FLOOR | May 15, 1989 |